Full Set Chicken Pig Farm Cleaning Scraper Cattle Manure Removal Machine Manure Removal System
Technical Parameters of Manure Removal System
Product Name | Manure Removal System |
Material | Stainless hot galvanized |
Voltage | 220V/380V |
Usage | Poultry Farm |
Cleaning Type | Floor Sweeper |
Cleaning Process | Physical Clean |
Feature | Non-Toxic poultry manure scraper removal machine |
Description of Manure Removal System
The Manure Removal System is used for the cleaning of feces in poultry and livestock. It is easy to operate, convenient and practical. It is an ideal cleaning equipment for farms. It has been widely used in laying hens, broilers, pheasants, pigeons, ducks, geese, pigs, sheep, cattle, rabbit and other livestock breeding pens.
Working Principle of Manure Removal System
Reducer output shaft transmit power through the chain or V-belt to the main drive wheel.Driving wheel and tensed traction rope firction do the traction to drive the scraper back and forth movement. Scraper worked by the crescent slide wipe and automatically fall back and lift to complete the fecal operations.
Advantages of Manure Removal System
(1) Safe, continuous traction rope, long service life;
(2) Can achieve unmanned management, automatic timing cleaning, preset time.
(3) Manual temporary cleaning system, simple and quick operation, easy to switch the working term;
(4) Multi-stage power transmission, increase friction,strong power;
(5) Scientic design, scraper automaticaly retract, easy to adjust the board and clean feces;
(6) 380V three-phase power supply power output;( or customized as customer requirment )
(7) Main device can run 1-4 scrapers, the longest scraper travel 140 meters.
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.