Enquiries
Message
Home > Products > Machinery > Refrigeration & Heat Exchange Equipment > Cold Room
Forced Draft Fan for Waste Incineration Boiler
  • Forced Draft Fan for Waste Incineration Boiler

Forced Draft Fan for Waste Incineration Boiler

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Textile Clothing Co.LTD
Meo Textile Clothing Co.LTD
China - Hangzhou
Manufacturer
Trade Capacity
Export Percentage
Nearest Port
shanghai,ningbo
Accepted Delivery Terms
Employees
101-200 people
Accepted Payment Currency
USD,CNY
Average Lead Time
60 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Type:
Centrifugal Fan
Applicable Industries:
Manufacturing Plant, Construction works , Energy & Mining, Industrial boiler system
Customized support:
OEM, ODM, OBM
Electric Current Type:
AC
Blade Material:
steel
Mounting:
FREE STANDING
Place of Origin:
Henan, China
Brand Name:
SIMO
Model Number:
SIMO Blower 9-08
Voltage:
380~660V, 3~11KV
Warranty:
1 Year
After-sales Service Provided:
Field installation, commissioning and training
Application:
Used for waste incineration
Total Pressure:
2705~15700Pa
Medium Temperature:
0~80C
Driving Mode:
Direct, Coupling, Vee belt
Suction style:
Single suction style
Impller:
16Mn steel plate
Main spindle:
High-quality carbon steel
Lube oil:
HJ-20#
Motor:
LA or other brand
Product name:
Forced Draft Fan for Waste Incineration Boiler
Supply Ability
Supply Ability:
300 Set/Sets per Month centrifugal fan and axial fan manufacturer
Packaging & Delivery

Forced Ventilation Fan for Waste Incineration Boiler  

 

 

 

Pursue excellent quality, make perfect product!

 

 

 

 

 

Applications for  Forced Ventilation Fan for Waste Incineration Boiler

 

 

 

 

♦ Boiler’s air supply and exhaust (Coal-fired boiler, Biomass boiler, Garbage incinerator, CFB boiler, Chain grate boiler…).

♦ Industrial boiler blowing air, Industrial boiler inducing air, Industrial boiler primary air, Industrial boiler secondary air.

♦ Industrial boiler waste gas desulfurization, Industrial boiler flue gas denitrification.

 

 

 

 

 

 

 

Application

Temperature

Normal temperature Air

Hot Air

Air composition

Clean air

Dusty air

Corrosive gas

Combustible gas

Powder materials

Light particle materials

Performance

Impeller diameter

400~1600

mm

Speed of mainshaft

960~2900

rpm

Pressure range

3031~16250

Pa

Flow range

2198~123090

m3/h

Structure

Blade

Backward

Impeller Support

SWSI (Single Width, Single Inlet), Impeller overhung.

SWSI (Single Width, Single Inlet),
Bearing housing is self-supporting. 
One bearing on each side supported by independent pedestals.

DWDI (Double Width, Double Inlet), 
Bearing housing is self-supporting. 
One bearing on each side supported by independent pedestals.

Drivetrain

Coupling drivetrain

Can assign

 Lubrication

Oil bath lubrication

Can assign

Bearing cooling

Air cooling or Circulating Water cooling

 

Circulation Oil cooling

System
configuration

Motor

SIEMENS, ABB, SIMO, LA

Can assign

Impeller

High-strength alloy steel

Impeller cone (Air Inlet)

Carbon steel

Case

High-strength alloy steel

Air damper

Carbon steel

Main shaft

High-strength carbon structural steel

Bearing

FAG, SKF, ZWZ, C&U

Bearing housing

Cast iron

 

Drivetrain

Coupling

Can assign

Foundation bolt

   

Optional
components

System base frame, Protective screening,
Silencer, Inlet & Outlet pipeline compensator,
Inlet & Outlet flange,  Damper, Electric actuator,
Shock isolator, Diaphragm coupling, Fluid coupling, 
Motor rain cover, Temperature sensor, Vibrating sensor, 
Soft starter, Inverter, Special Electrical Motor,
System monitoring Instrument, 
Lube system, Overhead lube tank.

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToEric Zhang
Meo Textile Clothing Co.LTD
Enquire
Related Categories
CoolingTowerHeatExchangerIndustrialChillerIndustrialFreezerOtherRefrigeration&HeatExchangeEquipmentLyophilizer
Popular Searches
bifold doornoble doortoledo stoolcold room ukcold roomsalt roomgold sonamood condomsgold pom pomsholly rootcoir broomgold probecondo doorboard bookgold spoongolden hoodgold vodkacold cowold boltgolden condompolo bootsgold epoxysock loomsgold groutgold visorbold lockshard broompooja roomcold room doorgold visorgold condomsyard broomgold hogfood boothgold corollawood boomgold oboegold sofatoad venomroland motor