Factory Manufacturer Ultra-low Temp Chiller Machine Price for Petrochemical
Lneya has developed about 52 models to meet all kinds of needs.
We support customization services, pls consult us for details.
The data in the form is standard data:
Model | LC Series | LJ Series | LN Series | LD Series | CDLJ Series |
Temp. range | -25~5℃ | -45~-10℃ | -60~-10℃ | -80~-30℃ | -115~-50℃ |
Cooling capacity -20℃ |
12~360kw | 12~360kw | |||
10320~309600Kcal/h | 10320~309600Kcal/h | ||||
Cooling capacity -40℃ |
6~180kw | 12~360kw | |||
5160~154800Kcal/h | 10320~309600Kcal/h | ||||
Cooling capacity -55℃ |
6~180kw | ||||
5160~154800Kcal/h | |||||
Cooling capacity -60℃ |
6~270kw | ||||
5160~232200Kcal/h | |||||
Cooling capacity
-75℃ |
4~180kw | ||||
3440~154800Kcal/h | |||||
Cooling capacity
-90℃ |
3~180kw | ||||
2580~154800Kcal/h | |||||
Cooling capacity
-110℃ |
2~120kw |
||||
1720~103200Kcal/h | |||||
Circulation pump info |
6.6~50m³/h 2.5bar max |
6.6~50m³/h 2.5bar max |
6.6~50m³/h 2.5bar max |
6.6~65m³/h 2.5bar max |
6.6~50m³/h 2.5bar max |
Cooling water | 8~100m³/h | 8~100m³/h | 10~120m³/h | 10~250m³/h | 10~360m³/h |
Cold storage | 200~4000L | 200~4000L | 200~4000L | 200~5000L | 100~2000L |
Expansion tank | 100~1800L | 100~1800L | 100~1800L | 100~2200L | 50~1000L |
Power max 380V 50HZ |
10~247kw | 10~247kw | 14~300kw | 14~588kw | 14~768kw |
Weight | 800~5000kg | 800~5000kg | 850~5600kg | 950~8000kg | 950~9000kg |
Compressor | Dorin semi-closed compressor | |||||||||
Operation Panel |
7-inch color touch screen display, temperature curve record |
|||||||||
Control System | SIEMENS S7 PLC&Module,Set temperature difference of refrigeration on & off | |||||||||
Closed Circulation System |
The whole system is a full closed circulation, there is no oil mist at high temperature and no water vapor at low temperature, pressure do not rise up when system is running. The system will supplement oil automatically at low temperature |
|||||||||
Circulation Pump | LNEYA Mangetic Pump/German Brand Mangetic Pump | |||||||||
Evaporator | Danfoss/KAORI plate heat exchanger | |||||||||
Condenser | Casing type water-cooled condenser / tube-type water-cooled condenser | |||||||||
Intermediate heat exchanger | Danfoss/KAORI plate heat exchanger | |||||||||
Refrigeration accessory |
Oil separators, drying filters, expansion valves, refrigeration solenoid valves, pressure control, mirrors, etc. all use Emerson / Danfoss and other brands |
|||||||||
Electric |
AC contactors, intermediate relays, circuit breakers, thermal relays, etc. are Schneider / ABB brand |
|||||||||
Refrigerant | R404A/R23 mixture,optional: R125/R23 mixture | |||||||||
Secondary refrigerant | No corrosive liquid, ethanol water, heat transfer oil etc. | |||||||||
Safety Protection |
High pressure protect; water supply cut-off protection; over-current protection; leakage protection; sequential and phase failure protection; High temperature protection; Sensor Failure protection; Liquid low level protection etc. multi-safety protection |
|||||||||
Level Indicator | Adopt glass liquid level indication | |||||||||
Piping material | Expansion tank, cold storage tank and circulation pipeline are all made of SUS304 | |||||||||
Case material | Channel steel + square tube + cold rolled plate sealing plate spray 7035 |
After sale service
Quality assurance
Guarantee that the industrial freezer for sale are sold to be conform to the provisions of the contract and qualified industrial freezer for sale by factory inspection, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract.
Installation and debugging
After the arrival of the industrial freezer for sale, my company or my company agent is responsible for installation and debugging of equipment need on-site installation and debugging.
Inspection and acceptance
After installation and debugging, acceptance by the customer to confirm the industrial freezer for sale to be conform to the provisions of the contract and qualified new products, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract, and after the confirmation of a full set of technical documents, sign the installation acceptance report and confirm acceptance.
Training
At the same time of installation and debugging of equipment, my company's after-sales service engineer is responsible for technical training for user until user can be skilled of operation. In the process of using equipment by customer, customer can consult relevant technical issues to after-sales service personal of our company at any time, according to the situation, my company will arrange training on site or remote.
After sale service commitment
A full free one year warranty since the date of acceptance, during the warranty period, all repairs and spare parts are free of charge(instrukent malfunction caused bu human factors will be charged of cost price of spare parts); After the warranty period, we will be responsible for maintenance of equipment for lifetime, according to the actual maintenance fees, appropriate fee will be charged.
(PS:There will have extra charge if the customer need on-site service. And customers need to describe the issue first and then send some failed pics or videos in advance, then Lneya judge if it is possible to go for after-Sales on site. )