When painting, the external air is filtered by the primary filter and sent to the roof by the fan, and then filtered and purified by the top filter for a second time.The air in the room adopts the full-drop type, flowing downward at the speed of 0.2-0.3m/s, so that the spray particles cannot stay in the air after painting, but are directly discharged from the room through the outlet at the bottom.
Such ceaseless cycle changes, make the air inside the room when spray bakes paint cleanness amounts to 98% above, and the air that sends has certain pressure, can form a constant airflow around the car in order to remove excessive paint, ensure the quality of spray paint thereby utmost ground.
When baking, adjust the air door to the position of baking, hot air circulation, the car spray baking room temperature quickly rose to the predetermined drying temperature (55℃-60℃).Fan will be filtered at the beginning of external fresh air after heat exchange with the heat converter to the auto spray paint the roof of the chamber, after a second filtration purification, circulate in hot air passes through the throttle action, in addition to breathe in a small amount of fresh air, most of the hot air heated by continue to use again, make the room of the lacquer that bake temperature gradually increased.
When the temperature reaches the set temperature, the burner automatically stops;When the temperature drops to the set temperature, the fan and burner automatically open, so that the temperature in the baking room remains relatively constant.Finally, when the baking time reaches the set time, the baking room automatically shut down, the end of baking.
SOL-QF2 Product Specification | ||||||
Parameters | Outside size | 7000×5350×3400mm(L×W×H) | ||||
Inside size | 6900×3900×2650mm(L×W×H) | |||||
Entrance door | 3 folds,3000x2600 mm(W×H), bending steel without covered frame | |||||
Cabin system | -Sandwich style EPS 50mm,0.376mm thick steel, anti-flame and heat-insulation. -High quality galvanized steel roof panel | |||||
Basement | -Galvanized Steel Assemble,300mm high,Quadrate Steel Support, 2 rows of grills,3 rows of indented plates. -2 ramps,external setting,620*2000mm(W*L)/pc | |||||
Ventilation system | Inlet fan | 2*4kw Double-intake Centrifugal Fans, model: YDW4.5M1, air capacity:12500m³/h for each set | ||||
Outlet fan | Optional | |||||
-Intake air from side upper ,adopt powder quadrate steel frame , strong and beautiful . -Cabinet for the fan*1unit ,air duct*2m long*1unit, -Elbow:90°*1 unit | ||||||
Airflow speed | 0.3m/s,ventilation rate:280time/h | |||||
Heating system | Burner | Italy RIELLO G20 Oil Burner, heating capacity: 200000Kcal/h, with BELIMO 10N electric damper | ||||
Heat Exchanger | 1.2mm thickness SUS304 stainless steel | |||||
Filtering system | Primary filter | Grade G2 plate type , filtering rate>83% | ||||
Ceiling filter | EU5 grade high efficient filter,filtering rate>98% | |||||
Floor filter | Multi-layer fiberglass filter,filtering rate>70% | |||||
Ceiling lights | 24pcs*36w Philip tubes with electronic ballast . | |||||
Side lights | Optional | |||||
Control system | Control Panel | Intelligent Control System | ||||
Function | Lighting, temperature time setting, painting, constant temperature painting, baking,emergency stop, failure indication, time accumulate, etc | |||||
Total power | 8.9KW | |||||
Voltage/Frequency | 380V,50HZ,3 phase |
Q. What should I expect from a new spray booth?
A. Filtration: Quality finishes require clean contaminate-free air which is accomplished by proper air filters. Prior to air entering the booth, SHANDONG ORIENTAL uses pre-filters to capture large particles and debris, and high-efficiency intake filters to filter out any remaining dirt and dust particles. The air is filtered again before it is recirculated or exhausted from the booth.
Airflow: Proper airflow in the booth is accomplished by creating a flow of air that envelops the vehicle during booth operation. This airflow is responsible for carrying away paint overspray during the refinish process, and air movement during paint curing.
Lighting: Another key element is bright, shadow-free lighting throughout the booth. YANTAI WINNER utilizes color-corrected light fixtures, in the proper quantity and correct location. This creates an environment that allows for proper color match and paint flow identification.
Q. How do you control your quality?
A. Our factory is ISO certified. We have our own QA and QC team. They will check on site and finished products to ensure all details to meet our highest standard and the customer's requirements.
Q. What is your payment terms?
A. We accept T/T, L/C, Western Union, Alibaba Trade Assurance, etc.
Q. How long is your lead time?
A. For stock or regular products, our lead time is 7 to 15 days. For custom-made products, our lead time is 20 to 30 days.
Q. What is your warranty?
A. Our warranty is 18 months. Parts have free replacement excluding artificial damage in Warranty. We will also stock spare parts as long as one equipment of this type is running in the world.
Q. How about visiting your company?
A. We welcome your visit at any time. Our factory locates in Shandong province in China.