Musical Dancing Fountain perfectly combines the water spray with the music, which could fully express the music spirit by phantasmagoric water features and colorful lightsIn this system,the computer firstly identifies audio frequency and the MIDI signal, then converts them into signal instructions. finally output to control system to command the performance of water and lights. The water features perfectly corresponds with the music beat and colorchange of lights, thats why it is called as musical dancing fountain.
There are 2 types control mode in Musical Fountain: PLC and multimedia.
In the later mode, the operator could edit and change tne water features performance according to his own understanding to the music by the friendly-operation interface of software.
Company Name | Suzhou Gold Ocean Co.,Ltd |
Business Type | Manufacture & Trading |
Service Range | Fountain Design, Manufacturing, On-site Installation & Aftersales Maintenance |
Company Location | Jiangsu,China (Mainland) |
Company Cetifications | ISO 9001:2015; CE; Audited by SGS & Bureau Veritas; SABER; SASO |
Main Markets | Global |
Oversea Projects | Exported & Built Fountains In Over 69 Countries |
Supply Ability | 100 Sets per Year |
Fountain Payment Terms | T/T, L/C |
Fountain Delivery time | 15 - 25 Days |
Fountain Type | Multimedia Control / Music Control / Program Control / Classic Static |
Fountain Warranty | 12-month Free Warranty |
Packaging | Wooden Case |
Minimum Order Quantity | 1 Set |
1. What services do you provide?
Our services include fountain design, fountain manufacturing, on site installation guidence, operation & maintenance training and 12-month warranty and life-long technicial support.
2. what do you need to make a fountain proposal?
To provide you most suitable proposal, we need below fountain information:
a. Fountain Type(music dancing, non-music control, static)
b. Fountain Site(Lake or River, Concrete Water Pool)
c. Fountain Size & Water Depth(Length & Width, Diameter, picture or CAD drawing)
d. Power Supply(voltage, frequency, single phase or 3 phase)
e. Target Budget (if you have)
f. Special Requirements (if you have)
3. What's the method of payment?
T/T, L/C, Western Union are available for us.
4. How long is the delivery time?
Normally the delievery time is 15-25 days after received advance payment.