Waterfall Fountain is usually used in the large landscaping project, such as bridge and rockery, etc, which could produce a kind of splendid scenery.
This kind of fountain can be applied independently or designed together with the Musical Dancing Fountain or Program Control Fountain
Company Name | Suzhou Gold Ocean Co.,Ltd |
Business Type | Manufacture & Trading |
Service Range | Fountain Design, Manufacturing, On-site Installation & Aftersales Maintenance |
Company Location | Jiangsu,China (Mainland) |
Company Cetifications | ISO 9001:2008; CE; Audited by SGS & Bureau Veritas |
Main Markets | Global |
Oversea Projects | Exported & Built Fountains In 63 Countries |
Supply Ability | 100 Sets per Year |
Fountain Payment Terms | T/T, L/C |
Fountain Delivery time | 15 - 25 Days |
Fountain Type | Multimedia Control / Music Control / Program Control / Classic Static |
Fountain Warranty | 12-month Free Warranty |
Fountain Nozzle Material | Stainless Steel 304 |
Light Type | RGB Underwater Light, LED24V/5W/12W/18W/36W, Stainless Steel 304 Shell |
Control Cabinet Voltage | 220v/380v(Mainly) / Customize |
Packaging | Wooden Case |
Minimum Order Quantity | 1 Set |
1. What services do you provide?
Our services include fountain design, fountain manufacturing, on site installation guidence, operation & maintenance training and 12-month warranty and life-long technicial support.
2. what do you need to make a fountain proposal?
To provide you most suitable proposal, we need below fountain information:
a. Fountain Type(music dancing, non-music control, static)
b. Fountain Site(Lake or River, Concrete Water Pool)
c. Fountain Size & Water Depth(Length & Width, Diameter, picture or CAD drawing)
d. Power Supply(voltage, frequency, single phase or 3 phase)
e. Target Budget (if you have)
f. Special Requirements (if you have)
3. What's the method of payment?
T/T, L/C, Western Union are available for us.
4. How long is the delivery time?
Normally the delievery time is 15-25 days after received advance payment.