Basic Parameter | ||||
No. | Component | Description | ||
1 | Main Steel Structure | 2.5-3.0mm galvanized steel structure, c purlin, square tube, angel steel, etc. | ||
2 | Roof Tile | Container Plate, sandwich panel | ||
3 | External Wall Panel | 100mm glass wool panel (can be customized, such as EPS, rock wool, PU for insulation material) | ||
4 | Door | Sliding door, security door, sandwich panel door(Can be customized) | ||
5 | Window | Aluminum alloy Sliding Window, blind window (Can be customized ) | ||
6 | Flooring | Mgo board, Laminate floor, Plywood (Can be customized ) Fireproof & waterproof | ||
7 | Ceiling | Metal ceiling plate (Can be customized ) | ||
8 | Electrical Installation | Circuit hidden installation, 3C/CE/CL/SAA Standard,with distribution box, lights, switch, sockets, etc. | ||
Technical Parameter | ||||
No. | Description | Specification | ||
1 | Bearing Load | 150kg/square meters | ||
2 | Wind Pressure | 0.45KN/square meters Equal 10 Grade | ||
3 | Earthquake Resistance | 7 Grade | ||
4 | Temperature Resistance | -25°C to 50 °C | ||
5 | Life Span | More Than 40 years | ||
6 | Optional Accessories | Furniture, sanitary, kitchen, A/C, electrical appliance for accomodation, office, dormitory, toliet, kitchen, bathroom, shower, steel roof, cadding panels, decorative material, etc. | ||
7 | Advantage | (1) Fast installation: 2 hours/set, save labor cost; (2) Anti-rust: all material use hot glavanized steel; (3) Waterproof: without wood ceiling,wall; (4) Fireproof:Fire rating A grade (5) Simple foundation:just need 12pcs concrete bolck foundation; (6) Wind-resistant(11 level) and anti-seismic(9 grade) |
How to order? | ||
Step 1 | Tell us your requirements | |
Step 2 | Quotaion will be sent based on your requirement. Solution will be recommended to you as the alternative | |
Step 3 | Negotiate and confirm each details for goods, trading terms and so on, get agreement and sign contract. | |
Step 4 | Advanced payment and production | |
Step 5 | Factory Examine Goods/ rectify and reform to meet the requirements of contract. | |
Step 6 | Balance payment and shipping | |
Step 7 | Handing Shipping files to help clients get goods from transporter in time. | |
Step 8 | Clients get goods and go into warranty time. |