Enquiries
Message
Home > Products > Other
Drainage Geomat/Erosion control mat EM4
  • Drainage Geomat/Erosion control mat EM4

Drainage Geomat/Erosion control mat EM4

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Warranty:
1 Year
After-sale Service:
Onsite Installation, Drainage Geomat/Erosion control mat EM4
Project Solution Capability:
Others, Drainage Geomat/Erosion control mat EM4
Application:
Villa
Design Style:
Industrial
Place of Origin:
China
Brand Name:
BPM
Model Number:
BPMGM
Product name:
Drainage Geomat/Erosion control mat EM4
Color:
Grenn,Dark green,Black
Thickness:
10-20mm
Material:
HDPE
Unit Weight:
220-480g/sq.m
Certificate:
ISO9001
Supply Ability
Supply Ability:
40000 Square Meter/Square Meters per Day Drainage Geomat
Packaging & Delivery

 

 

 

Drainage Geomat/Erosion control mat EM4

 

 

3D Drainage Geomat ( three dimensional erosion control mat) Description:

 

Introduction: It is a kind of new 3D Drainage Geomat structural geosynthetics , which is applied in water and soil conservation

 

Features: Preventing soil erosion, increasing the greening area and improving the ecological environment

 

Specification of the Three-Dimension Erosion Geomat:

Item                                          Spec

EM2

EM3

EM4

EM5

Weight per sq.m. ≥(g/sq.m)

220

260

350

430

Thickness ≥(mm)

10

12

14

16

Width≥(m)

2

Length ≥(m)

30

Vertical tensile strength ≥(KN/m)

0.8

1.4

2.0

3.2

Horizontal tensile strength ≥(KN/m)

0.8

1.4

2.0

3.2

Remark

The special spec or size can be manufactured according to the demands of the contract.

 

 

Function:

1.Before the greensward grows, it prevents the surface

of the land from the erosion of the wind and rain.

2 .Form compound protection layer with the plant ,

standing the wash-out of the high water level and large speed current.

3.Replace the concrete, asphalt, and block, using in the slope surface protection of roadway, railway, river-way, dyke, and the hillside, etc.

 

 

Installation:

 

Shaping and compacting the sub soil to the required profile.

1, Unrolling the 3D Geo-mat down the slope and fixing it in position with 150---300mm u-pegs.U-Pegs should be spaced between 300mm and 700mm depending on the substrate to ensure that the 3D Geo-mat makes contact with the surface.Overlaps should be pegged at 100mm centres in dry applications and 300mm in wet applications….

2, Anchoring the top of the embankment in spade-deep trenches and ,Where necessary,anchoring the edges to prevent the 3D Geo-mat slipping on the slope and uplift…

3, Longitudinal edges should be overlapped 50mm and transverse edges overlapped 150mm…

4, After seeding the subsurface at a rate of 20-30.

 

For more detail,pls contact email jane at hdpetmc.com

 

 

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher