ZM-360 Double Spiral Loop Notebook Calendar Binder Making Machine Double Ring Binding Machine Without Changing Mold
Specification
Model | ZM-360 |
Speed | 1200 Books/Hour |
Air Pressure | 5-8 Kgf |
Wire Diameter | 1/4''-11/4'' |
Max Width Of Binding | 360mm(14.2'') |
Power | 1 PH 220V 50/60HZ |
Machine Dimension (Main machine) | 2020*950*1250mm |
Machine Dimension(Feeding reel) | 780*560*1200mm |
Machine Dimension(Converor) | 2160*370*700mm |
Net Weight | 300KG |
Main Feature
The machine is used for binding double wire books, notebooks, wall calendars, etc. It can bind 1/4" -1 1/4" without changing binding tools. With the integration of automatically unwinding the spool, loops cutting, conveying and closing, it increased the production efficiency and lowered the cost remarkably.
*Controlled by PLC.Easy to set and adjust.
*There are no tools to change as the closing press is adjustable for all the diameters.
*Especially suitable for binding the notebooks which the cover is bigger than inner sheet
*This machine has no mold ,include convey belt,Wire diameter :1/4''-1 1/4''
*Voltage specification : 1PH 220V 50/60HZ (other voltage on request )
Packing Details | Wooden case/Carton |
Delivery time | Within 5-7 working days |
Transport way | Sea,Express,Truck,Air |
Zhengzhou Zomagtc Company Ltd. have been designing, developing, manufacturing and marketing Machinery for more than 10 years. Firstly we mainly sever china mainland customers. In order to adapt to world market development, now we do the exporting business directly. After these years of development, we have high quality professional teams,skillful talents, strong technical force, strong and independent research and development capabilities, advanced productione quipment and a perfect after-sales service system.
Lower price |
We produce and export machine directly |
Competitive price |
With a cheaper labor force which make our price more competitive |
On time shipment |
Most developed high way system and logistics deliver company make sure on time shipment |
Producing line |
Own advanced manufacturing equipments and computer controlled making machine, so our factory implement assembly line entirely. |
QC |
Strict quality control system to make sure the quality is good and stable. |
Sincerity |
Once cooperation, the whole life friendship |
1. Q: What is your delivery term?
A: FOB,CIF,CFR usually.
2.Q: What is your payment?
A: T/T.30% deposit, 70% balance before delivery. T/T and L/C, 30% TT deposit, 70% L/C.
3.Q: What is your delivery time?
A: Small and middle machine always in stock, can delivery within one week. Large machine need to confirm.
4.Q: What is your warranty and other terms?
A: One year warranty. Spare parts are free for customer in 1 year, but customer have to pay delivery. We can send our engineer to customer factory for 7 days free installing and trainning, customer have to pay tickets, visa, meals and hotel. If need more training, $100.00 per day to our engineer.
Company: Zhengzhou Zomagtc Co.Ltd
Contact person:Ellen
TradeManager: cn1511056821
Website:https://electech.en.alibaba.com/
Whatsapp/Wechat/Viber:+8619138001306
Click here, come back to Product Categories