Material | Zinc/Aluminum Alloy, Brass, steel, iron,etc | ||||||
Process | Die casting, investment casting, lost wax casting,sand casting | ||||||
Tolerance | +/-0.02mm or as drawing requirement | ||||||
Casting tolerance | CT4-CT6 (GB/T 6414),CT7-CT9 (GB/T 6414) | ||||||
Casting Roughness | Ra 1.6-Ra12.5 | ||||||
Standard | ASTM, ASME, DIN, JIS, ISO, BS, API, EN,GB | ||||||
Certificate | TS16949,SGS, ISO, or as your requirement to do test by the third party | ||||||
Secondary Machining | Turning, cutting, milling, grinding and drilling | ||||||
Surface Treatment | Sand blasting, Powder coating, Painting, Anodizing , Polishing,Passivation, Anodizing, E-coating,Chrome/Nickel plating... |
• Agricultural equipment | • Automobile industry | • Auto parts |
• Electronic parts | • Furniture hardware | • Medical / dental instruments |
• Industrial valves | • Home appliance | • Miscellaneous equipment |
• Food grade products | • Building | • other industrial uses |
Type | Overview | L*W*H (mm) | Load Bearing (kg) | Description |
A | Non-fumigation wooden pallet + Carton | 1200*1000 | <1000 | 1. Plastic Bag & Carton & Pallet; 2. Cartons are neatly placed on pallets; 3. Wrapping Film with Strapping; |
B | Iron pallet | 1200*1000 | <1000 | 1. Products are neatly placed on pallets; 2. Wrapping Film with Strapping; |
C | Non-fumigation wooden box | 1200*800*1000 | <1000 | 1. Big plastic bags will be put into boxes; 2. Products are neatly placed on pallets; 3. Sealed well to protection from dampness; 4. Wooden box with Strapping; |
D | Non-fumigation wooden box + Carton | 1200*800*1000 | <1000 | 1. Antirust Oil; 2. Pack individually in kraft paper in carton; 3. Cartons are neatly placed into boxes; 4. Wooden box with Strapping; |
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold.
Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced
Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.