1 Use IGBT/MOSFET technology, greatly improves the reliability of the machine.
2 High duty cycle, greatly improves the efficiency of the welder, energy saving.
3 Small size, stable and durable quality.
4 Easy to start arc, little spatter, stable current, and good formation.
5 Acid and basic electrodes are usable
6 High no load voltage, strong arc force with compensation force function.
7 Widely used in indoor decoration, and high working places jobs.
Item | TIG200P AC/DC | TIG220P AC/DC |
Power voltage | 230 | 230 |
Frequency(HZ) | 50/60 | 50/60 |
Rated input current(A) | 28 | 28 |
Output current(A) | TIG 10-200 MMA 10-150 | TIG 10-220 MMA 10-170 |
No-load voltage(V) | 56 | 56 |
Rated duty voltage(V) | TIG 18 / MMA 26 | TIG 18.8 / MMA 26.8 |
Pulse frequency(Hz) | 0.5-5 | 0.5-5 |
Pulse width(%) | 10-90 | 10-90 |
AC balance(%) | 20-80 | 20-80 |
Current fall time(s)[4T] | 0-10 | 0-10 |
Remote control | YES | YES |
Arc strike way | HF | HF |
Efficiency(%) | 85 | 85 |
Duty cycle(%) | 40 | 40 |
Power factor | 0.73 | 0.73 |
Insulation class | F | F |
Protection class | IP21S | IP21S |
Weight(KG) | 20 | 20 |
Measurement(MM) | 600*440*415 | 600*440*415 |
Quality Controll During Manufacturing Process
Production Line
Within 10 work days for samples and 30 days for mass production.
Welcome. Please inform us formally before our production and confirm the design firstly based on our sample. We have professional R&D team to support best service, and give you best suggestions.
Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Our raw materials are purchased from qualified suppliers. And we have a strong quality control team to guarantee our products quality.If you have any issue with our product, simply send us a message Contact us. Your problem will be solved within 7* 24 hours.
We provide one year factory quality warranty.
Normally samples order: about 2-4 days; Large order 20-30 weeks.
Sure, any time!