Enquiries
Message
Home > Products > Minerals & Metallurgy > Steel > Bearing Steel
Customized prefabricated steel structure building low cost office hotel factory workshop warehouse steel building
  • Customized prefabricated steel structure building low cost office hotel factory workshop warehouse steel building

Customized prefabricated steel structure building low cost office hotel factory workshop warehouse steel building

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Machinery Co.LTD
Meo Machinery Co.LTD
China - Hangzhou
Manufacturing and trade
Trade Capacity
Export Percentage
0-30%
Nearest Port
Shanghai
Accepted Delivery Terms
Employees
501-1000 people
Accepted Payment Currency
USD,EUR,JPY
Average Lead Time
90 Day(s)
Certifications
Product Specifications
Dimensions
customization
Product Description
Overview
Quick Details
Standard:
AiSi, ASTM, bs, DIN, GB, JIS
Grade:
Q345 Q235 S235JR S355JR
Place of Origin:
Henan, China
Brand Name:
Canglong
Model Number:
customization
Type:
Light
Application:
Steel Structure building
Tolerance:
±1%
Processing Service:
Bending, Welding, Decoiling, Cutting, Punching
Product name:
Steel Structure Building
Purlin:
C.Z Shape Steel Channel
Color:
Client's Request
Application Fields:
Office Building
Roofing:
Sandwich Panel. Single Steel Sheet
Material:
Q235 Q345B S235 S355 SS400
Name:
Steel Structures Warehouse Steel Structure Workshop
Certificate:
CE Certification
Window:
Aluminum Alloy Window
Drawing design:
AutoCAD
Supply Ability
Supply Ability:
5000 Ton/Tons per Year
Packaging & Delivery

Customized prefabricated steel structure building low cost office hotel factory workshop warehouse steel building from China supplier

our servise

 

MaterialSpecification
LengthWith customers' requirement
WidthSingle span, double-span, Multi-span
HeightWith customers' requirement
ColumnQ235, Q345 welded H section steel
BeamQ235, Q345 welded section steel
PurlinQ235 C channel or Z channel
Vertical and transversal supportQ235 angle steel, round bar or steel pipe
Cladding systemEPS, PU, Fiber Glass and Rock Wool sandwich panels or corrugated steel sheet with fiber glass wool insulation, available indiffrerent colors and gauges.
DoorSandwich panel sliding door or roller door
Window1) PVC sliding window, white color, with dimensions according to customers' requirement; Supplied with fly screen.
2) PVC casement window, white color, size is according to customers' requirement.Supplied with fly screen.
Partition wallsandwich panels (EPS, PU, Fiber glass,Rock Wool etc.) available in Different colors&gauges
BraceQ235 round bar
Earthquake-resistance8 grades
Structure usageUp to 40 years
Finishing optionsvast array of colors and textures available

 

Project detail

 

Main material

 

our factory

1,CangLong Group is a set of steel structure, color steel plate, composite panels, polyurethane panels, steel building caps, concrete integrated residential design and development, production, installation and maintenance.

2,Since the group established 15 years, through continuous improvement of the quality system and management system, we have passed the ISO9001:2008 Quality Management System certification and CE-EN1090 certification.

Packaging Details

 

Main steel frame without packing load in 40'OT.

Pack all the material to the pallet and push into container, roof and wall panel load in 40'HQ!

Wrapped by water prove paper and plastic film, covered by steel sheet.Strapped with steel strips to prevent damage from transportation.

Customer visit

 

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

 

 

No desirable products?
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToPeter Shen
Meo Machinery Co.LTD
Enquire
Related Categories
SpringSteelStainlessSteelSteelStripsSteelStructuresStructuralSteelTinplate
Popular Searches
bearings 21319bearing 205carbon steelbearing 1640bearing baringbearing 220149ps4 steering wheeldeering knivesbmw steering wheelbearing agentgear wheelmetal steering wheelbearing er16earthing sheetzebra steelbearing 566719bearing 6007 zbearing 7007bearing 7x17x5bearing opener toolsrendering trowelbearings nu209earring needlebearing 22214 ekbearing 23124bearing cf10bearing 6201rzracing camelkneeling angelvariant wheelsearring needlebearing 5x9x3bearing 623f30 steering wheelbearing 6009bearing drumbearing 6200vferro steelbearing 28584squaring shear