The production line using the most advanced Hatschek process, with the fully automated line. 1:the automatic batching system delivery the raw material to the pulping machine,then the pulping machine mixing the cement,limestone powder,wood pulp fiber,paper fiber,glass fiber into slurry.
2: put the slurry into the slurry blender by slurry pumps,then take the mix slurry to the Hatschek machine,then use the net cloth to the inside of the slurry mixture extraction dehydration,and then embryo forming machine with pressure adsorption in the network with slurry pressing binder in the wall is formed on the strip.
3:Though the thickness measuring instrument,the part which reach the thickness index were cutting off by wire and push to the billet machine,during the conveying process,complete the width of longitudinal cutting.
4:through automatic crosscut stacker complete of the horizontal scale cutting,then sucked up by molding chuck and blending forming into the mold.Then through the for station automatic palletizing stripper piling up the boards,a piece of mold a piece of tile,can stacking 120-150 pieces of tiles.
5:Put the stacking tiles into the pre-curing room for about 8-12 hours,then can into the production line to stripping.150 tiles
of a stack,then into the warehouse,three days later can be sold.