Engineers available to service machinery overseas, Online support, Free spare parts, Field maintenance and repair service
Product name:
water filling machine
Processing Types:
pressure
Function:
Washing Filling Capping
Material:
Stainless Steel 304
Bottle type:
PET Plastic Bottle
Usage:
Beverage Packaging
Capacity:
12000-16000BPH
Control:
PLC+ Touch Screen
Bottle Size:
500ML
After Warranty Service:
Video technical support, Online support, Field maintenance and repair service
Local Service Location:
Kenya, UAE, Nigeria
Certification:
CE ISO
Packaging & Delivery
CGF32-32-10 Drinking Water Filling Machine
Product Description
Products Description
Technical parameter
Model
CGF18-18-6
CGF24-24-8
CGF32-32-10
CGF40-40-12
Rushing Head
18
24
32
40
Filling Head
18
24
32
40
Caping Head
6
8
10
12
Production Capacity
3000
4000
5000
6000
Installed Capacity
4
4.8
7.6
8.3
Company Profile
Our main products have: Water filling production line, water treatment system,juice filling production line, carbonated drinks production line, and also 5Gallon bottle filling production line, and all other auxiliary equipments.
Every year we attend the exhibitions, like Canton fair, PROPAK, and other exhibitions in Dubai, Kenya, Saudi Arabia and Algeria and etc., that time we always visit some local old customers and we are sure that we can offer more and better services than other supplier.
We warmly welcome customers all over the world visit our factory!
Certifications
Why Choose Us
Our Service
FAQ
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.
No desirable products?
Sourcing assistant>
How to start your business
Step 1
Find your interested products by search keywords
Step 2
Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
Step 3
After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
Step 4
Set up meeting with the Chinese supplier without language barrier