Enquiries
Message
Home > Products > Home Appliances > Laundry Appliances > Clothes Dryers
Coated Non-stick Soleplate industrial steam iron cloth steamer steam pressing foldable travel iron with ironing board
  • Coated Non-stick Soleplate industrial steam iron cloth steamer steam pressing foldable travel iron with ironing board

Coated Non-stick Soleplate industrial steam iron cloth steamer steam pressing foldable travel iron with ironing board

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo wig Trading Co., Ltd
Meo wig Trading Co., Ltd
China - Hangzhou
Manufacturer
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
51-100 people
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
BRC
Product Specifications
--
Product Description
Overview
Quick Details
After-sales Service Provided:
Free spare parts
Warranty:
1 Year
Application:
Outdoor, Hotel, Commercial, Household
Power Source:
Electric
Type:
Steam Iron
Cord Length (m):
3
Power (W):
220
Voltage (V):
1200
Place of Origin:
China
Brand Name:
yITING
Model Number:
TT
Hose length:
4m
Function:
Iron garment,trousers, curtain,sheet,doll
Water capacity:
0.8L
Power:
1200W
Voltagle:
220-240V
Working time:
30Min
Package:
1pc/GB ,8pcs/1CTNS
Aprroval certificate:
CE,CB,CQC,Rohs,REACH
Feature:
electric iron steam iron,pump steam iron
Keywords:
handheld garment steamer,handheld travel steamer
Certification:
CB, ce, RoHS
Packaging & Delivery
Multi-Functional pump pressure steam electric iron with foldable ironing board 
Related products

Parameters

As a leader professional manufacturer of garment steamer,

Yiting is always ready to provide first class products and services to our business partners

 

 Factory Model:TT

 

 

Voltage (V)

220-240V~

 Alarm for lack of water  

and shut off function

Y

Power (W) 1200W  Function  Ironing garment,trousers,curtain,

get rid of sheet's mite bug ,

doll  disinfection

Steam generated time(s)  60's Protection system Y
 Steam flow(g/min)  25g  Accessories

N

 Working time 

30minutes

 Sample leadtime   One week
 Water capacity(L) 0.8  Loading quantity(20'/40'/40HQ)  20':1280pcs  /

  40': 2640pcs  / 

 40HQ:3320pcs

 Cable length(M)

3M

 Price valid   one month
 Hose length(M)

4M

  Aprroval certificate  CE,CB,CQC,Rohs,REACH
 pole material N   Package  1pc/GB ,8pcs/1CTNS
 Pole adjustable length(M) N   CB size(mm)  380*250*180
 Boiler material Titanium Aluminum alloy  MC size(mm)  1150*380*180
 Ironing head material PC+PA+Stainess steel

MC Volumn(CBM)

800*520*390
 Removeble water tank(Y/N) N  MC G.W.(kgs) 18
 Steam control One power level, 

 switch control panel,             pump control steam

  MC N.W.(Kgs) 16
 
 
Product Description

 

 

Company Information

 

 

 

OUR FACTORY

 

The company has an integrated production system including plastic injectionn, boiler design and production

 

WE has strong R&D team has become the leader manufacturer  in garment steamer  areas after more than 15 years 'development.

CERTIFICATE

 

 

As a leader professional manufacturer of garment steamer, Yiting is always ready to provide first class products and service to our business partner.

 

Packaging & Shipping

 

 

FAQ

1. If I want to put my brand on packing and products, what is the order quantity, is there any upcost?

There is no upcost for customized packing if the order quantity can meet MOQ

 

2. What is the nearest FOB port?

Ningbo

 

3. What certification you’ve got for overseas markets?

We’ve obtained CE/LVD,CE/EMC,GCC,CB,Rohs certification/test report for the products.

 

4. What is the delivery term?

It is always 25-30 days after the arrivals of L/C or 30% deposit payment.

 

5. I would like to know if ODM is acceptable.

Both OEM and ODM is acceptable

 

6. What is the nearest international airport if I would like to visit your factory?

Shanghai international airport is preferable.

 

 

 
 
 
 
 
 
 
 
No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToEmily Li
Meo wig Trading Co., Ltd
Enquire
Related Categories
ClothesDryersElectricIronsGarmentSteamersOtherLaundryAppliancesSteamPressesWashingMachines
Popular Searches
nutmeg buyersclothes liftclothes rack partslowes dusterswater fryerlotus treekettle fryersprotherm boilersclothes kiloclothes steamerlotus carswasher dryer4xl chest wadersclothes rackclothes drying wireclotted creamclothes for dollkorea dryerscoffee buyerskettle fryerclothes shreddertea dryerlouver pressclothes chengclothes for resellersslotted bracketsclothes arkclothes clampclothes conveyorcore dryerlowes seedsclothes steamerladies boxerslotus doorsclothes tradeclothes dividersclothes closetplotter tonerhopper dryerclothes paris