China Factory iTeaQ Power high quality 1kva ups pure sine wave 24v for elevator
TM11/RM11 1-10kVA Tower/Rack UPS
Introduction:
TM11/RM11 1-10kVA is based on online double conversion technology, which is an ideal power supply solution for small-capacity scenarios and can completely eliminate all kinds of grid problems. It covers the capacity range of 1-10KVA, tower or rack installation.
Scenarios:
Small and medium enterprises, branches of large enterprises, bank branch networks, large supermarkets, homes, offices and other AC power supply scenarios.
Features:
1.Wide input voltage range
2.Online double conversion technology
3.DSP digital control technology
4.Output power factor 0.9
5.Communications: RS232/USB/Dry contact card/SNMP option
Benefits:
1.Wide input voltage range adapt to harsh power grid
2.Friendly man-machine interface, easy to operate
3.Intelligent battery management extend battery life
MODEL | TM1101/RM1101 | TM1102/RM1102 | TM1103/RM1103 | TM1106/RM1106 | TM1110/RM1110 | |
Capacity | 1kVA | 2kVA | 3kVA | 6kVA | 10kVA | |
Input | Phase | L+N+PE | ||||
Rated Voltage | 208/220/230/240Vac | |||||
Operating voltage range | 110~300Vac | |||||
Operating frequency range | 50/60Hz±6Hz | |||||
Power factor | ≥0.99 | |||||
Harmonic distortion (THDi) | ≤4% (100% linear load ),≤6% (100% non-linear load ) | |||||
Output | Phase | L+N+PE | ||||
Output voltage | 208/220/230/240Vac | |||||
Power factor | 0.9 or 0.8 | |||||
Voltage regulation | ±1% | |||||
Output frequency | Utility Mode: follow utility; Battery Mode:(50/60±0.1%)Hz | |||||
Crest factor | 3:1 | |||||
THD | ≤2% with linear load; ≤4% with non linear load | |||||
Efficiency(AC) | 94.5% | 95.5% | 95.0% | |||
Efficiency(Batt.) | 89.5% | 91.5% | 94.8% | |||
Overload | AC mode: Load≤110%, last 30min; ≤130%, last 10min; ≤150%, last 30s; >150%, 200ms to bypass. Battery mode: Load≤110%, last 1min; ≤130%, last 10s; ≤150%, last 3s; >150%, 200ms to bypass. | AC mode: Load≤110%, last 30min; ≤130%, last 10min; ≤150%, last 30s; >150%, 500ms to bypass. Battery mode: Load≤110%, last 10min; ≤130%, last 1min; ≤150%, last 10s; >150%, 500ms to bypass. | ||||
Battery | Standard unit QTY | 2 | 4 | 6 | 12-20 | 14-20 |
Long unit QTY | 3 | 6 | 8 | 12-20 | 14-20 | |
Charge Current | 1A for standard unit, 1-8A adjustable for long unit | 1-12A adjustable, 1A default | ||||
Transfer Time | Utility to Battery : 0ms; Utility to bypass: 0ms | |||||
Environment | Operating temperature | 0℃~40℃ | ||||
Storage temperature | -25℃~55℃(no battery) | |||||
Humidity range | 20~95% (non condensing) | |||||
Altitude | < 1000m | |||||
Noise level | <45dB | |||||
Protection | Alarm | overload, utility abnormal, UPS fault, battery low, etc | ||||
Protection | short circuit, overload, over temperature, battery low, fan fault alarm | |||||
Communication | RS232,USB, dry contact card, SNMP card(optional) | |||||
Tower | Dimension D×W×H (mm) | 282x145x215 | 397x145x215 | 397x145x215 | 384x190x318 | |
Net weight L/S(kg) | 4/9.8 | 6.8/17 | 7.4/27.5 | 11.5 | 12.5 | |
Rack | Dimension D×W×H (mm) | 410x438x88 | 600x438x88 | |||
Net weight (kg) | 13 | 14 | 14.2 | 17 | 20 | |
Standards | EN62040-1, EN62040-2 |
Pictures
OEM Plug and socket is acceptable
Company
Shenzhen iTeaQ Power Co., Ltd. is the leading manufacturer of modular UPS and network power, located at Guangming High-tech Zone, Shenzhen, China. With 20 years’experience in power electronics field, we are constantly cooperating with global partners, enabling customers to protect their critical applications and ensuring business continuity. iTeaQ Power is a most growing UPS and network power provider.
R&D
The company dedicates 10% of turnover to R&D, such as cooperation with China top-ranking universities and institutes, advanced research, patent development, etc. It can achieve status of always technology ahead. Benefited from the electronic industry base of Shenzhen, China, all our design engineers have master or above degree in power electronic, and at least 10 years UPS and power practice.
Quality
The company implements total quality management, ranging from selecting right person for appropriate post, components selecting, incoming inspection, producing, testing, and packing to delivery. At present, it has passed ISO9001, ISO14001, OHSAS18001, and has obtained a number of certifications, such as CE (LVD/EMC), TLC certification, energy saving certification, etc.
iTeaQ Power office , Exhibition,and UPS producing workshop showing:
iTeaQ Power PCBA producing
with the most advanced technology and management
*UPS on Pallet with standard export carton
1. Professional R&D center: Employed designers with at least more than 10 years working experience in UPS power. Our products always keep the same pace with the markets. OEM and ODM are warmly welcomed.
2. High quality: Using high quality material and establishing a strict quality control system, such as we use branded breaker, assigning specific persons in charge of each part of production,from raw material purchase to assembly.
3. Original factory , you can get the best price and service
4. Fast dispatch: Can deliver the goods within 1 month.
5. Small Moq: 1pcs is acceptable