Installation location selection: this product is suitable for installation on the flat top of the building or the plane of the iron tower, the surrounding should be open, the ground personnel are easy to observe.
Installation: cement ground with 8×80 expansion bolts fixed base; iron tower plane with screw fixed base; main rod and base installed in place, in turn installed on the rod / support ring.
Attention: the main rod should be installed perpendicular to the ground. If the slope of the installation is large, a 30×30 cement platform should be cast first, such as only a small angle of inclination can be adjusted in the lower part of the base.
Lightning protection measures: such as high, the base and lightning rod, lightning belt can be firmly connected.