* High-transmittance and low reflection
* Inspection:GB15763.2-2005.ISO9050
* High solar transmittance
* High mechanical strength
Module Type | DHM72-320 | DHM72-325 | DHM72-330 | DHM72-335 | DHM72-340 | ||||
Maximum Power(Pmax) | 320W | 325W | 330W | 335W | 340W | ||||
Open-circuit Voltage (Voc) | 45.6V | 45.9V | 46.1V | 46.3V | 46.5V | ||||
Maximum Power Voltage(Vmp) | 37.0V | 37.3V | 37.6V | 37.9V | 38.2V | ||||
Short-circuit Current (Isc) | 9.08A | 9.17A | 9.26A | 9.36A | 9.45A | ||||
Maximum Power Current (Imp) | 8.65A | 8.72A | 8.78A | 8.84A | 8.90A | ||||
Module Efficiency (%) | 16.51% | 16.77% | 17.02% | 17.28% | 17.54% | ||||
Power Tolerance | 0~+5W | ||||||||
Standard Test Environment | Irradiance 1000w/m2, Ambient temperature 25℃, Spectrum AM 1.5 |
* High-transmittance and low reflection
* Inspection:GB15763.2-2005.ISO9050
* High solar transmittance
* High mechanical strength
* High output-power: conversation efficiency is about 18%-21%
* High shunt-resistance: adapt the several environmental conditions.
* Low CTM(cell to module)loss: Operating Temperature:-40°C to +80°C
* Bypass diode minimizes the power drop by shade
* Aluminium extrusion profile with prompt delivery
* Available in customized surface finish
* Excellent material for smooth and subtle edges
* Elegant appearance
* High current and voltage carrying capacity
* Simple, quick and safe effective field assembly
* IP 67 it can be used in the outdoor iron environment
* Expansion connector are available for future requirement
60cells PV module | 20GP | 40GP | 40HC |
Pcs/pallet | 30 | 30 | 30 |
Pallet/Container | 14 | 28 | 28 |
Pcs/Container | 400 | 840 | 924 |
72cells PV module | 20GP | 40GP | 40HC |
Pcs/pallet | 27 | 27 | 27 |
Pallet/Container | 10 | 24 | 24 |
Pcs/Container | 270 | 648 | 696 |
Payment Term | T/T | EXW | 30% T/T in advance, balance paid before dispatch | ||
FOB | |||||
CNF(CFR) | 30% T/T in advance, balance paid againist copy of B/L | ||||
CIF | |||||
L/C , Money Gram , Western Union , Paypal | |||||
Delivery Time | 7-15 working days after down payment received |