Advantages:
1. Stable arc, less splash
2. Shaped good appearance
3. Easy for removal of slag layer
4. Easy for striking arc and restriking arc.
5. Operable with low amperages on sheet metal
6. Slag control accommodates vertical down welding
91.8% Response Rate
91.8% Response Rate
91.8% Response Rate
Q: 1. Can I have a sample order?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q: 2. What is the lead time?
A:Sample needs 1-3 days, mass production time needs 5-7 days for order less than 1000 pcs.
Q: 3. Do you have any MOQ limit?
A: Our MOQ is 10 pieces
Q: 4. How do you ship the goods and how long does it take arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Q: 5. How to proceed the order if I have logo to print?
A: Firstly, we will prepare artwork for visual confirmation, and next we will produce areal
sample for your second confirmation.if mockup is ok, finally we will go to mass production.