1.Facility basic summary and requirement
The machine adopt to servo location, PLC controlling, auto operation, main drive adopt to import motor drive, multi degree rotation via chain, chain wheel speed regulator ect. It auto degree is high, reliable controlling, easy to adjust, intelligentize manipulation ect advantage, can widely used for beverage, beer, chemistry, food, medicine ect industry, can do all kind of tin and bottle second time package, can match with auto filling production line.
2. Main parameter
Product capacity:20 carton per minute
Rating power: 10KW
Used power supply: three phase,380V,50Hz
Controlling power supply: 24V DV
Compressor air:1500L per minute, 0.6-0.8Mpa
Hot melting glue solidify time: 1.5-2S
Machine weight: 3500kg
Overall size: L6285*W2582*H2115MM
Bottle entry conveyor size: L3000*W620*1200MM
Package product overall size: Length 350-450,Width 230-330mm, Hieght:85-320mm;
Package bottle diameter: D55-108MM
Cardboard requirement: accord with international GB/T6544-2008
Facility basic summary and requirement:
Facility name | Carton package machine | Power supply | 380V,three-phase |
Production capacity | 10-25pack/ minute | Power supply | 220V AC |
Product package qualified ratio | >99.8% | Controlling voltage | 24V DC |
Hot glue solidify time | ≤1.5-2S | Main machine power | 10KW |
Facility weight | 3.5T | Gas consumption quantity | 1500 L/min |
Machine overall size | 6285*2582*2115 | Compressor air requirement | 0.6~0.8MPa |
Bottle enter size | 3000*620*1200 | Package product overall size | (350-450)Length (200-330)Width (85-320)Height mm |
Noise | 85dB | Circumstance temperature requirement | 0—45℃ |
Circumstance humidity requirement | Usually below 75%RH | Workshop requirement condition | Firm foundation |
Facility collocate requirement | Dry, anti-dust, good ventilation good condition | ||
our services
Mechanical Warranty
One year warranty and Lifetime technical support Install in Spot
If Engineers install in spot
1) Installment USD100/day. Person as allowance
2) Training fee is free for customer’s workers within the installation period
3) The tickets from China to the customer factory and return paid by the customer
4) The local housing , food, and transfer cost at customer factory paid by the customer
packaging and shipping
Ø Delivery Time: 40 days after get your deposit.
Ø Coming Document:
1) Machine Quality Guarantee
2) Complete set install & maintain instruction Book in English language
3) Complete Document for customer to clear its custom
Ø Packaging requirement:;
1) The special packaging box is according to the immunity standard in China, it suits for long-distanceay
transport, damp proof, rustproof, land way and seaw
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 20-30 days,if complete production line it is 45-60 days.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
My Skype ID is : AlexLiu
My WhatApp ID is: +8618306163101
My Viber ID is: +8618306163101
My QQ ID is: 826053691
My Wechat ID: audisevice
Please not hesitate to tell me if having any questions