DAY 1 bars and E&M concealed cable containment. |
DAY 2 Install wall, column panels and beam panels. |
DAY 3 Install beam side panels and slab panels. |
DAY 4 wall panels and pillar panels. |
DAY 5 |
Q1: What is Aluminum Formwork? |
A: A construction system used for forming all of the cast-in-place concrete structures of a building including walls, floors, beams, stairs etc. It can be easily applied to simple column, beam, and slab constructions and offers many advantages over other traditional construction methods. |
Q2: How do you use it? |
A: Panels are assembled using a very simple pin and wedge system to create a mold for concrete pouring. Walls are held together with high strength wall ties, while slab panels are supported by beams and props. After casting, the panels can be easily removed for reuse. |
Q3: Why should I use it? |
A: Aluminum formwork is a versatile solution for forming concrete structures and is especially cost effective and efficient. Compared to conventional construction procedures, it provides a very high quality finish and evenness, while reducing floor competion cycles to 4-5 days. The lightweight panels eliminate the need for tower cranes, making installation both easier and safer. Our formwork is also easily adaptable to varying structural geometries and wall heights. |
Q4: What kind of material is used in this panel? |
A: Aluminum alloy 6061 & 6082 |