Feature of our copper cable granulator machine:
Our Advantage
1.The airflow sorting machine adopts eccentric shaft vibration, which has higher efficiency and longer life.
2.The airflow sorting machine can adjust the vibration frequency and wind force to adapt to the processing conditions of various materials.
3.The cutter structure of the crusher has been proved by hundreds of experiments, and simple adjustment can process different wires, and can process various wires of 0.2mm-30mm.
Our Feature
1.The inlet of the crusher is specially designed, and a leather curtain is added to prevent the material from rebounding and protect the safety of workers.
2.The lower part of the crusher adopts an openable design, which makes the replacement / cleaning of the crusher screen simple and quick, and minimizes the maintenance time.
3.This copper rice machine has the characteristics of low noise, large output and strong innovation. The copper in the cable separated and recovered by this machine can maintain the original copper quality, and can also recycle plastics, which can produce greater economic benefits.
Specification of our copper cable granulator machine:
Model | Processing area | Host size | Machine weight | Yield | Power |
SM-FT-400 | Φ0.5-30mm | 275*190*220cm | 2100kg | 200-300kg/h | 27kw |
SM-FT-600 | Φ0.5-30mm | 390*200*225cm | 3200kg | 300-400kg/h | 40.5kw |
SM-FT-800 | Φ0.2-30mm | 720*750*220cm | 5800kg | 700-1200kg/h | 76kw |
SM-FT-1200 | Φ0.5-30mm | 1000*870*310cm | 11200kg | 8000-12000kg | 118kw+15kw |
Working Principle of our copper cable granulator machine:
Mainly aimed at all kinds of car circuit lines, motorcycle lines, household wires, industrial wires, battery car lines, TV sets, washing machines, refrigerators, air conditioners and other household appliances lines and household wires, communication lines, computer lines and other wire stripping machines are not suitable Processing various waste lines.
Detailed pictures of our copper cable granulator machine:
Standard export carton or wooden case packing.
3-20 days after confirming order,detail delivery date should be decided according to
production season and order quantity.