egg sheet rolling machine
Description
Performance and features
1.Automatic grouting, egg rolls mature automatically open the machine, with automatic induction package system; one operation, convenient and practical.
2.Temperature controller using digital high temperature, temperature control, egg roll color uniform.
3.Padded insulation cotton, energy saving; this machine up and down for the thickened plate high temperature.
4.Safety performance, high productivity, high efficiency.
5.Egg size, thickness can be debugged
6.Can do striped, checkered, flat pattern of different lines of egg rolls.
7.Can do a variety of miscellaneous grains egg rolls, corn / millet / black rice / sorghum / purple sweet potato / red beans / sesame / banana egg rolls.
8.low-fat, low-sugar, sweet and not greasy taste, crisp taste, all ages.
Specifications
Model |
SL-8 |
SL-10 |
SL-12 |
Power |
2.2kw for each hotplate |
||
Dimension |
1.5*1.5*1.2m |
1.65*1.65*1.2m |
1.9*1.9*1.2m |
Weight |
420KG |
470kg |
520kg |
Capacity |
12.5KG/H |
15kg /h |
17.5kg/h |
Power |
18 kw |
22kw |
28kw |
Taizy company is specialized in producing, selling and serving food processing production lines.
Our company's main machinery such as: potato chips,banana chips,peanuts, walnuts, almonds, cashew nuts and pine nuts production line; macadamia nuts, chestnuts, pistachios, ginkgo, acorns, cocoa beans, castor beans, sesame processing machine; various nuts butter making machines, nuts roasting machines, vegetable and fruit machine,washing machine,frying machine,oil press machines, packaging machines, etc.Customer satisfaction is our ultimate goal.Looking forward to establishing cooperation with you.
1. Are you manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about delivery time of your machine?
Generally it needs 5-15 days for big machines or producing line,and it will be much longer but within our negotiated delivery time.