The greenhouse system mainly includes outer sunshade system,inner sunshade and warming system,cooling system,heating and warming system,compensating light system,ventilation system,control system,drainage system,auto-control system,ect.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 30 days after order.
Q: How to install the greenhouse? Do you provide installation service?
A:we will send engineer to do installation guidance.
Q: What preparations I should be before installation?
A:First finish the greenhouse building authorization from the government if required.
Second prepare the tools as per the tool list we send to you.
Third prepare the workers.
Forth prepare the power supply if needed.
Fifth prepare one place that can store the greenhouse materials after arrival to protect it from
rain if needed.