|
Display |
Item |
1. Loading coil car 2. Decoiler 3. Subber roller 4. Pinch/leveler 5. Loop pit and bridge 6. Leveler/pinch 7. NC length 8. Cross shear 9. Conveyor belt 10. Stacking device 11. Lifting table car 12. Hydraulic/pneumatic/lubrication system 13. Electrical cabinet |
Our Company ________________________________________ |
Our Advantages
_____________________________________________
|
Contact Us |
Tel | +86-757-8108 1122 |
Mobile | +86-13929919722 |
Fax | +86-757-8108 1116 |
honjiamachine@gmail.com | |
web | www.honjia-machine.com |
Address |
#1, Hongying Industrial Zone, Tangtou, Shishan Town, Foshan, Guangdong, China (Mainland) |
FAQ |
Q1:How much is your machine?
A1:Sorry, we cannot answer this question before understanding your exact demand and re- quirements. For example, if you ask: “how much is an APPLE iPhone?” It’s impossible for any salesman to answer. Basically we have to tell them exact model 3/4/5/6/7/8/X or plus, 32/64/128/256G, etc.
Q2:How can I know the design and proposal of the machine line?
A2:Generally speaking, we need to know:
(1)Machine type: slitting line or cut to length line (normal CTL or flying CTL) .
(2)Raw material info: such as thickness/width/master coil weight/coil ID/coil OD.
(3)Final product info: such as slit nos (at thinnest and thickest)/min. strip width/precision and tolerance/exit coil ID, etc.
such as target length to cut, length tolerance, diagonal tolerance, etc.
4)Line speed: normal type or high speed type
5)Line type: normal type or compact design (for example, same function with single loop or double loops)
6)Electrical system: China mainland/Taiwan/Japan/European brands
7)Optional functions: such as paper collector/film coating/burr masher/digital display/special loading and unloading designs, etc.
Q3:How long will you send the proposal and offer?
A3:We will need about 3~7 days to design the proposal upon collecting all details of the ab- ove mentioned info necessary.
Q4:When will you tell me the price?
A4:After confirming all detailed configurations of the machine line, that we are able to make offer for it.
Q5:How long do you need to produce the machine?
A5:We need about 3 months to produce light gauges; about 4~5 months to produce the me- dium gauges; 6~10 months to produce heavy gauges.
Q6:What pricing terms to you accept?
A6:We accept 30% TT as deposit and 70% TT before delivery. 30% TT as deposit and 70% LC terms is also considerable.
Q7:How long do you need to install and commissioning the machine line?
A7:Light gauges, we need about 10~14 days; Medium gauges, we need about 28 days; He- avy gauges, we need about 1~2 months.
Q8:How many people will come to install and commission the machine line?
A8:Light gauges, we will send 1 engineer, with the assistance of your stuff in your workshop. Medium/heavy gauges, we will send 2~3 engineers, with the assistance of your stuff in your workshop.
Q9:Do I need to pay extra charge for installation and commissioning?
A9:We are not charging extra fee for it, but the buyer is responsible for the round trip tickets/ visa/local transportation/hotels of our technicians as well as USD120/day/person allowance only.
Q10:What about the warranty of your machine?
A10:We offer 1 year warranty for our machine lines starting from the acceptance date of ins- tallation and commissioning.
Q11:How long do you need to prepare the foundation drawings for the machine line?
A11:Upon receipt of 30% deposit, we need about 30~45 days to prepare the foundation drawings for you.