Items | Aluminium formwork |
1. Material | Alu-formwork thickness 4mm |
2.Installation |
After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 8 days per storey. |
4.Machine assistance |
Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as: 1) Shifting of reinforcing steel rebar into assembly point 2) Removing debris from site 3) Loading and Unloading materials from trucks into site storage area. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 30-50 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
How to contact us?
Send your enquiry details below for the "free sample", click "send" Now !!!! We will get back to you immediately!