Anti Corrosion Salt Water Resistance Two-Component Polyurethane Marine Epoxy Boat Paint
A Video of Marine Paint Project Construction.
RPEH-405 High-Build Modified Epoxy Anticorrosive Primer (Iron Red) |
||||
Uses |
As maintenance antirust primer for newly-built ships or old ships. |
|||
Color |
Iron red |
|||
Application conditions |
Airless spray |
Recommended |
||
Nozzle orifice |
0.4~0.5mm |
|||
Nozzle pressure |
100~150kg/cm² |
|||
Thinning ratio |
0~10% .by weight |
|||
May be applied by spray, brush, or roller. |
||||
Thinner |
FXH-4 Epoxy Thinner |
|||
Mixing ratio |
Two components |
base/curing agent=8/1 by weight |
||
Pot life |
Temperature |
10°C |
20°C |
30°C |
Pot life |
10hrs |
8hrs |
6hrs |
|
Film thickness |
Dry film thickness 100μm/coat & Wet film thickness:185μm/coat |
|||
Solid content |
74.2% |
|||
Specific gravity |
1.45 |
|||
Coverage rate |
Theoretical |
0.21kg/m2/100μm 0.148L/m2/100μm |
||
Actual: depending on the surface treatment, environment and application methods |
||||
Dry time |
Temperature |
10°C |
20°C |
30°C |
Dry to touch |
2hrs |
1.5hrs |
1hrs |
|
Dry to handle |
14hrs |
10hrs |
8hrs |
|
Coating interval |
Min. |
14hrs |
10hrs |
8hrs |
Max. |
— |
— |
— |
|
Shelf life |
12 months |
|||
Packing |
A kit 22.5kg contains Part A 20kg and Part B2.5kg |
|||
Surface preparation |
1.Remove salts and other water soluble contaminants with fresh water. 2.Remove oil in accordance with the solvent cleaning standard SSPC-SP1. 3.Remove rust and scale by sand blasting to ISO Sa 2.5 (SSPC-SP10). 4.Remove the contaminants like dust with high pressure blower. 5.Confirm the surface clean and dry before working. |
|||
Coating system |
Steel: Bare steel |
|||
Top coat: refer to our coating system |
Characteristics
Certification