1, Observe the corner of the ground and whether the wall is flat, not flat with a shovel to cut flat and then clean up, otherwise the foot line installed after bending uneven and some did not fully stick to the wall, will leave ugly gaps.
2.Back saw a section of 15 cm long aluminum alloy kicking line, the buckle card card on the back of the slot, against the wall in the buckle hole to make a mark.
Before drilling, the wiring direction of water and electricity should be observed to prevent mistakes.The interval of drilling should not be too big, generally around 40cm is more appropriate.
Use special tools to drill holes in the walls, and then screw them into the holes with plastic.Screw the buckle to the wall。
3.The wall convex to the corner called Yang Angle, concave to the corner called Yin Angle.Install Yin and Yang Angle is to use Yin and Yang Angle to draw fixed point position on the wall, take hole, nail plastic son next, fix Yin and Yang corner with screw on the corner again.
Note: because the water and electricity project pipe is buried in the wall, the switch socket is directly below the location of the pipe, punching to calculate the good position, to avoid damage.
4.Finally, measure the size distance of each section with a tape measure, cut the corresponding size with a cutting machine, and stick it on the corresponding buckle. When the wall exceeds the length of the toe line, add a card fastener in the middle of the joint, so as to ensure the evenness of the toe line.
The flatness of the wall should be tested before installation.