Enquiries
Message
Home > Products > Construction & Real Estate > Formwork
Aluminum Formwork System Construction Shuttering Concrete Formwork
  • Aluminum Formwork System Construction Shuttering Concrete Formwork

Aluminum Formwork System Construction Shuttering Concrete Formwork

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Food Co., Ltd.
Meo Food Co., Ltd.
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
0-30%
Nearest Port
Penang, Valparaiso,Jetta
Accepted Delivery Terms
Employees
501-1000 people
Accepted Payment Currency
USD,EUR
Average Lead Time
5 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Type:
Formwork
Warranty:
5 years
After-sale Service:
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts
Project Solution Capability:
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation
Application:
Hotel, Building Construction(Villas, Apartment, High-Rise Building)
Design Style:
Modern
Place of Origin:
Jiangxi, China
Brand Name:
GETO
Model Number:
GT-63.5/GT-65-sha
Formwork Panel Material:
Aluminum Alloy 6061-T6
Formwork Panel Thickness:
4mm
Frame Height of Formwork Panel:
63.5mm/65mm
Formwork Panel Weight:
22-25kg/㎡
Formwork Panel Bearing Capacity:
60KN/㎡
Formwork Panel Surface Treatment:
Mill/Coated
System Type:
Tie-Rod System/Flat-Tie System
Usable Range:
Wall, Column, Beam, Slab, Staircase
Usable Life:
300 times
Supply Ability
Supply Ability:
500000 Square Meter/Square Meters per Month
Packaging & Delivery

Aluminum concrete formwork,construction shuttering formwork,aluminium concrete form wall formwork

Product Description

If you ask me, what's the Most important thing in the world?

 

Developer and main contractor will tell you the Truth.

 

With the rapid development of economy, Time and Energy becomes particular important.

 

However, GETO Aluminium Formwork System save time and energy for you.

 

After that, you have more valuable time and energy to accompany with your family and friends.

 

Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.

 

 

 Aluminium Formwork Benefits

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation

After short period of training, workers can easily learn to install and dismantle the formwork.

3.Construction period 3-5 days per storey.
4.Machine assistance

Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as:

1) Shifting of reinforcing steel rebar into assembly point

2) Removing debris from site

3) Loading and Unloading materials from trucks into site storage area.

5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.

 

 

Product Overviews

 

Company Information

 Aluminum Formwork System Construction Shuttering Concrete Formwork from China supplier

 

 

 

 

Project site

 If clients require, GETO can provide field specilist to project site for guidance within one month without

 

charge, meanwhile, GETO will invite clients' site supervisor and workers to factory for learning and

 

training.

 

 

Our Services

1. Your inquiry related to our product & price will be replied within 24hours.
2. Well-trained & experienced staff are to answer all your inquiries professional in English of course.
3. Working time: 8:00am - 18:30pm, Monday to Saturday.
4. OEM is highly welcomed. We have strong R&D team here to help.
5. Your business relationship with us will be confidential to any third party.
6. Good after-sale service offered, please get back if you got question. 

7. Mock up/pre-assemble in factory before delivery. Thus we can avoid some mistakes in advance and correct them.

 

 Aluminum Formwork System Construction Shuttering Concrete Formwork from China supplier

 

 

  

Exihibition Show

 GETO takes each opportunity to expand business to the world, and bring our products and new technology, providing the best after-serve and create the biggest value and benefits to our clients. We attened oversea exhibition fair every year, in order to let more and more clients to save construction cost and do service for them.

 Aluminum Formwork System Construction Shuttering Concrete Formwork from China supplier

 

 

 

Packaging & Shipping

PACKAGE:

Standard export carton packing.

DELIVERY TIME:

Within 5-20 days after confirming order,detail delivery date should be decided according to
different projects and order quantity.

 Aluminum Formwork System Construction Shuttering Concrete Formwork from China supplier
FAQ

 Aluminum Formwork System Construction Shuttering Concrete Formwork from China supplier

-Q-:Can I use this set of formwork to another project?

Yes, there are nearly 70% standard panels can be common reused.

-Q-:What's your packing methods?

Protection foam+heat contracted plastic film. / wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.

-Q-:What's your payment terms?

T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status

-Q-:Are you manufacturer or trader?

A: GETO is the manufacturer of aluminum formwork system for 9 years. Our group has 4 factories, cove raged every scaffolding systems.

-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?

Well, we will send one or two field specialists to your construction site for guidance if you require.

-Q-: Do you have pre-mocking up service?

 Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,

then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.

-Q-: How to proceed an order for aluminum formwork?

1- Please provide completed project drawings to us.

2- GETO design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.

3- Construction details confirmed, sign sales contract, receiving deposit.

4- To work out shell drawings and modulation drawings.

5- Have meeting for confirming model details.

6- Production.

7- Acceptance and check.

8- Shipping.

 

 How to contact us?

Send your inquiry details in the below for "free sample", click "Send" Now !!!

Click here for More Information

No desirable products?
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToXun Cao
Meo Food Co., Ltd.
Enquire
Related Categories
Balustrades&HandrailsBathroom&KitchenCeilingsDoor,Window&AccessoriesOtherConstruction&RealEstateTiles&Accessories
Popular Searches
mivan formworkosb formworkzoom forkaari work* reworkbeamsworkmetal formworkgates formworkxcr forkformwork toolsgotta workcermarkpile formworkfoam formworkvorwerkmeva formworktable formworkgotta workbeam formworkzoo yorkformwork plankdri workperi formworkmeva formworkzari worksbeam formworkpororozari workfoam swordsoapwortgotta workdri workgotta workdri workosb formworkzari workearmorekomarkformwork pinsbrick formwork