Working up the roof,lay each roll of breathable membrane,fix counter battens and title battens at the specified centres.Laps to be laid in accordance to BS 5534 Part 1 for Slating and Tiling,End laps and vertical joints should be at least 300mm(vertical joints should be staggered).
1, the company professional to do carbon and solid fuels.
2, CE certification
3, Professional solution for you
Characteristics:
1.Waterproof, heavy duty, clean, light, flexible, non-absorbent surface
2.Fire resistant & antiglare
3.Recyclable, environmentally friendly
4.Effective in extreme temperatures both hot and cold
5.Easily install, cut, stapled, nailed or glued into place
6.Safe to handle with no special clothing or breathing Equipment
13862718746