Usage scenarios | household |
control mode | Digital control |
Time | 0-24 housrs adjustable |
Temperature range | 20~90℃(104~194℉) |
Trays | 6trays (30*30cm) |
Product Size | 420*315*450mm |
Package | 450*400*530mm 12.5KG |
Product Keywords | food dehydrator,stainless steel dryer machine,3 years Warranty |
Product Name | Food Dehydrator |
Model No. | ST-06 |
Material | Full stainless steel |
Power | 800W |
Voltage / Frequency | 100-240V~50/60Hz |
Temperature Ranges | 33~80℃ (91.4~176℉) |
Max. Timing | 30hrs |
Noise Level | 45~50dB |
Capacity | 7~10KG |
Airflow System | Digital |
Total Racks | 12 trays |
Rack Size(L X W) | 290X290mm(11.4X11.4") |
Housing finish | Brushed finish |
Packing method / weight | Carton packaging/12.5KG |
Product Dimension(W X H X D) | 420X315X450mm (16.5X12.4X17.7") |
AC Power Cord | 1.5m lengt PVC sleeveh based on specific plug standard choice |
Superior full stainless steel ultra thick housing with brushed finish, durable in use;
Carefully selected food grade 304 stainless steel racks for food safety that contact with food directly. Clean up is a breeze!
Horizontal air flow circulation system allows each rack of food could be dried evenly and rapidly;
Thanks to our exquisite craftsmanship, the superb finish cabinet is formed in a neat and elegant shape;
High efficiency stainless steel heating element with high-density radiating fins, power saving can be up to 30%;
Ease of use. Preserve the food that will not be waste. Dehydrate fruits, vegetables, nuts, meat for jerky, fruit puree for fruit roll-ups, raise bread or make homemade yogurt!
Package | Materials | PE bag / EPE cushion / High strength corrugated carton | |
Export carton dimensions | (D)450X(W)400X(H)530mm (D)17.7X(W)15.7X(H)20.8" | ||
Net weight | 11.5kgs / 25.3lbs | ||
Gross weight | 12.5kgs / 27.5lbs | ||
Case pak | 1/1CTN | ||
Loading quantity | 20' container | 257pcs | |
40'HQ container | 574pcs |
1.Communication Requirements: Customer provide sample or design paper with details requirements.
2.factory quoting: quotation is passed by customer and factory provide die design.
3.making prototype: within 5-7days, provide the 1:1 mock-up
4.confirmation of prototype: customer confirm the 1:1 mock-up after several adjustment
5.Opening mould. Produce the mould according to the confirmation of 1:1 mock-up,takes around 1-2months
6.testing mould. Try the mould repeatedly and make sure there is no flaws on finished products.
7.Trial production. Small mass production after passing the mould testing and do fully product test
8.Mass production. Start mass production after passing the trial production, and customer pay the deposit.
9.Inpection&delivery. Delivery within 4 weeks, customer arrange the balance payment.
Our company has perfect equipment and high-quality technical team, can customize products according to customer requirements.