Using for wet and dry material chopping processing
Project Case
India
5 Tons Per Hour Plant
Use wet corn husk
Malaysia
3 Tons Per Hour Plant
Use wet and fresh grass
Product Feature
Using for wet and dry material chopping processing, such as: corn stalks, sorghum stalks, peanut stalks, bean stalks, mulberry leaves, phrynium placentarium, forage grass,Straw, wheat straw and others plant-based raw materials.
Application
Powder feed for Cows, Cattle,Goat and Livestock
Related Products
Straw Hammer
Mill
Type:
Straw Hammer Mill Capacity(t/h):
1-10 Power(kw):
37-220
Straw Cutting Machine
Type:
Straw Cutting Machine Capacity(t/h):
1-10 Power(kw):
37-220
Straw Grinding Machine
Type:
Straw Cutting Machine Power(kw):
37 – 110 Capacity(t/h):
5 – 20
Installation Case
Case: Cattle Feed Pellet Plant
Capacity: 1-1.5 Tons/Hour
Location: Saudi Arabia
Raw Material: Rice husk,rice straw, and alfalfa grass
Case: Camels Feed Pellet and Powder Plant
Capacity: 2.5 Tons/Hour
Location: India
Raw Material: Rice husk,rice straw, and alfalfa grass
Our Factory & Our Customer
Certifications
All our equipment has CEISOSGSTUV certification.
Luoyang Ludate Machinery Factory
Luoyang Luodate Machinery Equipment Co., Ltd. was foundin 1994, located in Luoyang which a famous industry city in China with superior geographical position and convenient traffic. We are a research & development production factory and have a professional design team.
Our Footprint In The World
Our footprints are all over the world, we selling equipment in many countries around the world, such as Australia, Malaysia, Philippines, Colombia, Egypt, etc.
Packing & Shipping
Conventional Packing
☆ Standard international export packing.
☆ Equipment was covered with plastic bags and was loaded in the wooden box that with steel frame structure.
☆ Spare parts will be protected in water proof bags and boxes.
Contact Us
What you want to know:
1. How long is the warranty period for the equipment?
2-year warranty, lifetime service
2. Do you have staff to install the equipment? Yes, we can send technicians to your country to guide the installation.
3. Are Siemens motor and stainless steel used? As long as you need, we can provide.
4. Can your equipment run 24 hours a day? Our equipment is strong and durable.It can operate 24 hours a day.
5. How long will it take to produce the equipment? Expected to take 30-50 days.
No desirable products?
Sourcing assistant>
How to start your business
Step 1
Find your interested products by search keywords
Step 2
Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
Step 3
After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
Step 4
Set up meeting with the Chinese supplier without language barrier