ASTM A733 NPT BSP Carbon steel electro galvanized pipe nipple 1/8''-6''
Material: Carbon steel
Technics: Casting
Shape: Equal
Size: 1/8"-6"
Surface:galvanized / black
Standard: ANSI,BS
Certificate: ISO9001&BV&TUV Certificate
Hardness: ≤HB180
Tensile strength:≥330N/mm
Test pressure: 2.4Mpa
Working pressure: 1.6Mpa
Usage: convey water,gas,oil
Material |
Carbon steel, Stainless steel 304/304L/316/316L |
Standard |
BS1387, EN10241, ASTM A733, DIN2982, JIS B2302 |
Threaded |
BS, NPT, DIN (ISO7/1, DIN 2999/2699, ANSI B1.20.1,BS21) |
Thickness |
0.5mm--10mm, sch20,sch30,sch40,sch80,sch120,sch160,std, XS, XXS, CLASS A, CLASS B |
Connection |
Male ,Female |
Size |
1/8" to 6" |
Type of pipe |
Welding or Seamless pipe |
Series |
Heavy Series, Standard Sereis, Medium Series, Light Sereis |
Standard |
ASTM A733, DIN2982, BS1387, JIS B2302 |
Size |
1/8" to 6" |
Length |
Standard or as request |
Thickness |
Standard or as request |
Material |
Carbon steel 20#,Q235,ST 37.2 Stainless steel: SS304/304L/316/316L/321 |
Thread |
NPT, BSP, EN ISO 228-1 |
End |
Single end thread, Both equal thread, Long-short thread, King nipple, Close, and special as customer’s request. |
Type of pipe |
Welding or Seamless pipe |
Surface |
Black, Hot galvanized, Electro galvanized |
Packing |
Wooden case |
Packaging Details: |
wooden case |
Delivery Detail: |
10-100 days depending on the quantity |
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.
Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10 days, average production time after sample approval is 2-3 weeks.
Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.