API 16A Stuffing box/stripper assembly for coil tubing BOP
When there is a tubing in the well, with the help of packing of certain size, the BOP can close the annular space between the bore and tubing and prevent the liquid in the well from kicking.
when the tubing in the well moves up or down, turing the pressure at the stripper control oil line can protect the surface of liquid lubrication in the well and to prevent the liquid in the well from kicking.
Technical Specification:
Model | 2 9/16"-10000psi BOP | 2 9/16"-5000psi BOP |
Rated Pressure | 10,000 psi | 5000psi |
Hydrostatic shell test pressure | 15000psi | 7500psi |
Bore Diameter | 2 9/16” 65mm | 2 9/16” 65mm |
Rated Temperature | T-20 (-29 ℃~121 ℃)/T-75 (-59 ℃~121 ℃) | |
Top Connection | union male | union female |
Bottom Connection | flange conneciton | union-female |
Maximum Hydraulic Pressure | 3,000 psi | 3,000 psi |
Hydraulic Volume to Close Shear Actuator (per set) |
0.7L | 0.7L |
Hydraulic Volume to Open Shear Actuator (per set) |
2L | 2L |
Weight | 518 lbs (235 kg) | 401 lbs (182 kg) |
Other offers:
Lake Petro is located in Dongying City, which is famous for Shengli Oilfield and the largest manufacturing hub of petroleum equipment in China. Following the principle of “quality first, science and technology innovated, people oriented”, every Lake Petro person is sparing no effort to provide the customers with best products and services. Our products are based on advanced production line and testing equipment, our products are designed and manufactured according to certification of API, ISO, GOST, etc.
How can I place order?
A: You can contact us by email about your order details, or place order on line.
How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Contact information: