Raw material | |
Substrate: | Rustproof high strength alloy aluminum plate |
Other substrates: | steel plate, stainless steel plate, titanium zinc plate, copper plate |
Core material: | 1. General polyethylene core layer; |
2. Low smoke halogen-free B1 grade high flame retardant core material; | |
3. Inorganic A2 class non-combustible core material | |
Surface coating | 1. PVDF Ultra Weather Resistant Coating |
2. PE Weatherproof Coating | |
Product specifications | |
Thickness of Aluminum Plate on Face/Bottom: |
0.12 mm, 0.18 mm, 0.3 mm, 0.4 mm, 0.5 mm (customizable in the range of 0.1-0.5 mm) |
Length (mm): |
Standard length 2440 mm(can be specified by customer) |
Width (mm): |
Conventional 1220 mm, 1250 mm, 1500 mm (can be customized, not more than 1600 mm) |
Thickness (mm): | Conventional 3mm, 4mm (customized within 1.5-6mm) |
Standard size: |
1,220 x 2,440 mm (special size can be made according to customer requirements) |
1, Q:Are you manufacture or simply trading company ?
A: We are the manufacture , welcome you visit our factory.sheet,building
800,1500,1500x3000mm,3D,3mm,4mm,4x8ft,acm,Acp,alucobond,Aluminum Composite Panel,aluminum
2,Q: Do you provide free samples ?
A:We do provide free samples under the condition that you assume the express shipping cost. cheap price,china,cladding,coil coated,color card,column,core,decorative,detail,door designs,exterior,wood panel
3,Q: How to place order ?
A: Please tell us the service you need, OEM or ODM, and the quantity , then we will make the PI for you.
Exterior Wall,FEVE,Finished,gas station,hardware,honeycomp,house,installation system,insulated,wall cladding
4,Q: How did you test the product before they are packed?
A :We have the strict QC procedure , each product will be tested by three times with professional machine before packing.
Interior,kitchen,laser cutting,line,material,Metal,Plate,project,pvdf,SGS,CE,Sheet,silicon,solid,system
5,Q:What's the delivery time ?
A: Usually 15-20 days after receiving deposit .
6,Q:Where is the shipping port ?
A:We ship the products via Foshan port, Guangzhou or any other ports depend on your needs.
7,Q: What about the payment terms ?
A: 50% TT advanced payment , balance need to pay before shipment.