This Is Our Black 80CC 2-Stroke Bicycle Cycle Gasoline Engine Motor Bike, Which Is Ideal for motorized bicycle.
The bicycle gasoline engine can greatly get the bicycle speed up to 50km/h, and it will surely be your excellent helper.
Engine type: Single cylinder,air-cooling,2-stroke gasoline engine
Include (as the picture):
1*2 stroke engine and CDI Assembly;
1*fuel tank and carburetor Assembly;
1*exhaust muffler;
1*clutch and left handle grip;
1*chain and sprocket;
1*chain idler pulleyand nuts;
1*set of brack and bolts;
1*44Tooth sprocket with 9 hole;
1*exhaust muffler fixer.
Speclfication | ||
Name | 80cc 2-Stroke Engine Motor Kit | |
Type | Bicycle Engine Parts | |
Engine type | Single cylinder, air-cooling, 2-stroke gasoline engine | |
Material | Aluminum/Alloy/rubber | |
Net Weight | 11.55kg | |
Size | 42.5*42.5*9cm |
1. Clutch:
a) Remove right side cover from engine.
b) Place a small dab of grease at gear mesh area.
c) Replace cover.
2.Carburetor:
Depending on dusty riding conditions, clean air filter every 5 to 20 hours of operation by removing the filter cover to access the screen and element. Wash element with a degreasing agent. Be sure element is completely dry before re-assembly.
3.Spark Plug:
Remove spark plug and inspect for excess carbon build up. Clean, re-gap to .6mm - .7mm if necessary. Check plug after every 20 hours of operation. A suitable replacement plug is NGK BP-6L if you can find it. Otherwise, go for the NGK B-6L. The NGK R7-HS is also recommended for better performance and smoother idling.
4. Exhaust system:
After 20 hours of operation check exhaust pipe for excessive oil and carbon build-up. Be sure to use supplied support strap to secure exhaust muffler to a solid anchor point on bike frame or engine.
a) Remove exhaust pipe cap by loosening the retaining screw.
b) Pull cap and baffle out of pipe.
c) Clean with degreaser, rinse and dry.
d) Re-assemble.
★★★NOTE: Excessive periods of low speed operation, idling or leaving fuel petcock in the "on" position during shut down periods may cause the pipe to become clogged with unburned fuel.
5. Chain:
Every time bike is ridden check the tension of the drive chain by:
a) Rolling to bicycle forward to remove slack from the bottom of the chain.
b) Find the center and push downward on the top of chain while measuring the deflection.
c) Tighten chain if deflection is more than 15mm.
d) Low speed "chain rattle" can be eliminated with the application of graphite grease to chain.
6. Head Bolts:
Tighten all fasteners after each five hours of operation. It's most important to check cylinder head bolts: tighten in a X pattern to 12 ft/lb. using a torque wrench. A two piece cylinder and head design engine requires head bolts be kept tight. Important: Check head bolts before each and every ride, vibration can cause them to loosen and blow a head gasket. Caution: Do not over torque or head bolts may break off.
7. Right side gears:
Remove cover plate and keep small amount of heavy grease on gear train. Do not over grease as leaks will occur and also may adversely affect clutch operation. Regular greasing if required will help reduce gear wear and keep gear train quiet.
Taizhou Xinydd Machinery Co., Ltd. was founded in 2015. We located in Binhai Industrial Area, Taizhou, Zhejiang Province. We have professional engineers and management team in the producing of the clutches for U.S.A, Russian, Europe, Brazil, and other countries. We have enough ability to satisfy different requirements from yours in this field.Who could bring a lot of international experience and professional and an unparalleled level of service for you.
Q1. How to pay?
A: TT, PAYPAL, WEST UNION, DP, DA, Credit card up to you.
Q2. What is your term of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q3. How about your delivery time?
A: Generally, it will take 24-48 hours after receiving your advance payment. Some is one week. The specific delivery time depends on the items and the quantity of your order.
Q4. How to produce customized products?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q5. How to get a sample?
A: We can supply the sample if we have ready parts in stock.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q7: How do you make our business long-term and good relationship?
A: 1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.