800ml dissolve and recycle waste biodegradable for save energy lunch box
Standard Packing
Tableware / Product Development
Step 1 Understanding customers’ demand and requirement
Step 2 Engineering drawings, hand drawings, or similar samples provided from customers
Step 3 Proposal and Quotation
Step 4 Order Confirmation
Step 5 Product drawing confirmation (7-10 days)
Step 6 Prototyping (if necessary, 7-14 days)
Step 7 Building the mould and tooling (30-55 days)
Step 8 Packaging Confirmation
Step 9 Samples confirmation (7-10 days)
Step 10 Mass Production
Step 11 Quality Inspection
Step 12 Delivery