1RJ45 Ethernet (LAN) interface, 10/100M/1000M adaptive, support TCP/IP protocol | ||
The network interface supports port auto flip (Auto MDI/MDIX) | ||
Support standard DMX-512 and ArtNet protocol, RDM protocol | ||
Support ArtNet←→DMX signal bidirectional conversion | 220V±10%/50±1Hz@40kW Three-phase 5 wire system | |
Support ArtNet←→DMX signal bidirectional conversion | 12 | |
DMX input/output can be set as available/disabled | 4KW | |
Each DMX output port can be set to five modes: single, zero, HTP and LTPRDM | 2(Linear switching) | |
Each DMX input can be set to normal mode/backup mode | 50% | |
Each channel with a digital signal indicator | 0~9 | |
It can be used as a DMX splitter/amplifier, 1 input 7 output: 1x7 or 2 input 3 output: 2x3 | ||
IP address can be set manually | 0℃~45℃ | |
Multiple user presets | 20%~90% | |
LCD display shows the status of each DMX port | –40℃~+55℃ | |
LED indicator indicates the status of the network port | 10% ~ 93% | |
Support software web page upgrade | 485mm ×515mm ×133 mm | |
8 DMX outputs or outputs can be set, all inputs/outputs are optically isolated | ||
Photoelectric isolation signal amplification, signal conversion, network expansion three in one |
There are 6 normal steps for QC control process: | ||||||||
Step 1: all materials passed 100% IQC inspect | ||||||||
Before send materials to workshop and start to produce, our IQC technicians will inspect them.And only the materials are approved to send to workshop if they are qualified. | ||||||||
Step 2: at least 48 hours aging test before packing | ||||||||
All unit lights will be 100% QC inspect and takes around 48- 72 hours aging test | ||||||||
Step 3: hang testing | ||||||||
Each batch production we will select certain percent to do hang or rotating test. | ||||||||
Step 4 : Environment high temperature testing | ||||||||
we did two parts test for high temperature testing : | ||||||||
A: testing during the product still in R & D | ||||||||
B: testing for each batch production | ||||||||
Usually we test the temperature reach to around 45℃. | ||||||||
Step 5 : vibration test--simulating transit environment | ||||||||
each batch production we will select certain percent to test to make sure the goods is safe in transport. | ||||||||
Step 6: waterproof testing (only for IP65 lights) | ||||||||
all waterproof lights we will do waterproof test to see can it be work fine under rain. |