6150 50CrVA Spring Steel Plate
50CrV4 SUP10 Alloy Steel Plate
Spring steel refers to steel due to the elasticity in the quenched and tempered condition, and specifically for the manufacture of springs and elastic components. Spring steel depends on its ability to elastically deform, i.e., within the prescribed range, the ability to withstand a certain elastic deformation so that the load does not occur in the permanent deformation after the load is removed.
Grade : | 51CrV4 | |||||
Number: | 1.8159 | |||||
Classification: | Alloy special steel | |||||
Standard: |
|
Chemical composition % of steel 51CrV4 (1.8159): EN 10277-5-2008
C | Si | Mn | P | S | Cr | V |
0.47 - 0.55 | max 0.4 | 0.7 - 1.1 | max 0.025 | max 0.025 | 0.9 - 1.2 | 0.1 - 0.25 |
Equivalent grades of steel 51CrV4 (1.8159)Warning! Only for reference
EU EN |
USA - |
Germany DIN,WNr |
Japan JIS |
France AFNOR |
England BS |
Italy UNI |
Spain UNE |
China GB |
Sweden SS |
Poland PN |
Czechia CSN |
Russia GOST |
Inter ISO |
|||||||||||||||||
51CrV4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
About packing
Jiangsu Xihao International Trade Co., Ltd has over 16 years of specialist experience in Die Steel, Special Steel, Nickel Alloy, Titanium Alloy, Copper Alloy, Aluminium Alloy, can obtain 4,500 kinds of alloy materials through our own channels in China. Our alloy materials were widely used in the aeronautics and astronautics, nuclear power, medical industry, die industry. The executive standards including G B, I S O, D I N, N F/ B V, B S, J I S/ J A S O /N D S, A S T M / S A E/ U N S/ A I S I.
Welcome to order and customized!
Certification
Our Services
Quality inspection before delivery
Q: Why choose us?
A: We have professional team, service and inpection.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock.
Or it is 15-20 days if the goods are not in stock, according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer sample for free charge, but freight cost collected.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us .