Taizi River Bridge Project
The elastomeric bearings are designed for bridge and building construction. Elastomeric Bearings are commonly used for steel beams, pre-cast concrete beams and other support points. The elastomeric bearings are made of highest-quality neoprene or nature rubber. The rubber was laminated by one layer or several layers thin steel plates(as per design requirement), in this way, the bearings can bear bigger vertical load.
Technical Index | Natural Rubber (-40℃-60 ℃) | Neoprene Rubber(-25℃-60℃) | ||||
Hardness(IRHD) | 60±5 | 60±5 | ||||
Tensile Strength(MPa) | ≥18 | ≥17 | ||||
Elongation at Break(%) | ≥450 | ≥400 | ||||
Brittleness Temperature(℃) | ≤ -50 | ≤ -40 | ||||
Compression Set(70℃×24h)(%) | ≤ 30 | ≤ 15 | ||||
Ozone Aging Resistance(20% strain,40℃ × 96h) | 25 pphm | 100 pphm | ||||
No Cracks | No Cracks | |||||
Hot Air Aging | Test Condition(℃ × h) | 70 × 168 | 100 × 70 | |||
Max Change in Tensile Strength(%) | - 15 | -15 | ||||
Max Change in Elongation at Break(%) | - 20 | -40 | ||||
Max Change in Hardness(IRHD) | -5 , +10 | 0 , +10 | ||||
Bond Strength Between Elastomer and Steel Plate(KN/m) | >10 | >10 | ||||
Bond Strength Between Elastomer and PTFE(KN/m) | >7 | >7 |
Hebei Mickey Badger Engineering Materials Sales Co. Ltd. is a high-tech enterprise specializing in the production and construction of bridge expansion devices, bridge bearings and other rubber products. Founded in September 2007, the company is located in Wujiazhuang Industrial Development Zone in the southern suburb of Hengshui City, Hebei Province, with registered capital of 100,677.7 billion yuan, fixed assets of more than 70 million, and 200 employees, including 42 professional and technical personnel. The company has a number of functional departments, such as enterprise management office, office, information department, R&D Department (General Labor Office), technology department, quality management office, material procurement department, marketing department, production and manufacturing department, installation engineering department, after-sales service department, safety office, testing and testing center.
Packing Details : Packed with PE films and pearl cotton, then placed in wooden box
Delivery Details : within 15 days of placing an order
Taizi River Bridge Project
Haicheng Guandimiao Bridge
Ningbo North Outer Ring Interchange Project
A: Yes, what specifications do you need? You can contact us..
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.