Brand | Product name | Certification | Color | Working class |
Dingya Crane | single girder bridge crane | CE,ISO | Yellow,red | A3~A5 |
1.What is an overhead crane inspection?
OSHA Periodic (Annual) Overhead Crane & Hoist Inspection. The Periodic (Annual) Overhead Crane and Hoist Inspection is a detailed visual and operational inspection. Individual components are examined to determine their condition. The Periodic Inspection is performed Annually, Semi-Annually and perhaps even Quarterly based on severity of service.
2.Why do you need an overhead crane?
Moving bulky loads on floors or through aisles requires a lot of time and can result in injuries. However, overhead cranes play a key role in this because they easily allow warehouse owners in lifting, lowering and moving loads horizontally.
3.What is the role of the grab bridge bucket crane?
Usually, the grab bucket crane is located at the top of the garbage storing pit and is mainly used for the operation of feeding, conveying, mixing, fetching, and weighing of garbage. The garbage grab crane manufactured by the crane factory can implement lifting and convey strictly to ensure normal work of garbage cremation power point.