4L 5 litre plastic jerry can mould motor engine oil lubricant bottle blow molding in steel
Order processing | Time |
Prepare material | 5 days |
CNC Machining | 10 days |
Precision CNC machining | 5 days |
Drilling | 5 days |
Polishing | 5 days |
Assembling and fitting | 5 days |
Mould testing | 2 days |
1. Check the HDPE bottle blow molding component.
2. Cleaning the HDPE bottle blow molding cavity/core and spread slushing oil on the mold.
3. Cleaning the HDPE bottle blow molding surface and spread slushing oil on the mold surface .
4. Put the HDPE bottle blow molding into the wooden box.
· Product 2D/3D drawing design;
· Plastic mould 2D/3D draiwng design;
· Mould making;
· Parts welding;
· Mass Production;
Our company was established in August 2016. The company has always been adhering to the concept of “detailed, cautious, not seeking to be big, but only to be strong”. The so-called exaggerated propaganda is not there. We still think that the mold is industrial technology, and we have to return to the essence, rigorous and reinvent the truth.
Our factory is located in Zhongshan city, Guangdong Province, with 30 employees and a registered capital of 3 million. It has high-precision imported processing equipment (Note: the existing manufacturers of bottle molds are basically made in China), and our company has introduced an import CNC machining companies carry out in-depth cooperation and are managed by our company, while other machine tools such as cars milling,grinding, milling and drilling are extremely complete.
Our main business is in lubricant oil , detergent, food, medical and cosmetics blowing mold,and the customer group is no shortage of leading enterprises in all walks of life. Although our company has been established for a short time, we have a positive heart, full of hard work and unremitting efforts.
The construction of corporate culture is an important part of the development of modern enterprises, an important manifestation of spiritual civilization, and an important guarantee for the long-term development of enterprises. In recent years, relying on the construction of corporate culture, improving the enthusiasm of employees, enhancing the cohesiveness of enterprises, and promoting the management, image, service and environment of enterprises to meet the standards of modern enterprises, the company has always shown a thriving trend.
Mould Processing :
1.Mould Design/sample
Product 2D/3D drawing, mould 2D/3D drawing, etc.
2.Discussion
Mould steel,mould cavity number,mould price,mould runner,payment item,etc.
3.Order placed
According mould drawing or sample.
4.Design mould
We will send mould design to customer for confirmation
5.Mould tooling
We start to make mould after mould design confirmed;
6.Mould processing
Send mould processing pictures to customer to well check mould progress;
7.Mould shot trial
Send mould shot trial samples to customer to confirm mould quality;
8.Delivery
Ship mould after mould quality confirmed.