Product | wabco charging valve |
Truck model | Suitable for all types of semitrailers |
Certification | ISO/TS16949 |
component | Air tank,lift axle control valve,levelling valve,lifting air bag,pressure limitting valve,charging valve,carrring airbag,penumatic tube,pneumatic conncector etc |
material | aluminum alloy |
OEM | available |
product description:
1. The principle of air suspension is to use air compressor to form compressed air and compressed air to adjust the height of the car from the ground. Air suspension also adds a certain degree of flexibility to the car. When driving at high speeds, the air suspension can be automatically hardened to improve the stability of the car. When driving on low-speed roads for a long time, the driving computer will make the suspension soft. Improve the comfort of the vehicle.
2. In the multi-axle semi-trailer system, the front axle is equipped with a lifting airbag. When the vehicle is empty, the front axle is lifted to reduce the resistance of the trailer, saving energy and reducing costs.
3. The air suspension system is equipped with a hand-operated valve and a height-adjusting valve, which can easily realize the axle lifting function, and has simple operation and high reliability.
solution:
1. We can provide you with an air suspension pneumatic system solution with different connection methods. (You can also supply different accessories according to your plan)
2. We have various types of Valve accessories, such as WABCO, KNORR, SORL, etc. The connectors are available with copper connectors and 45# material connectors to meet your different configurations.
3. We are a professional manufacturer of gas path solutions.
Our solution 1
air lift path for 3axle semitrailer
Packing details:
Packed in sets, carton package & pallet.
Delivery Time: 25 days after payment.
FAQ
Q1. What is your terms of packing?
A: Generally, goods are sealed in ploy bags and packed in cartons and pallet or wood cases.
Q2. What is your terms of payment?
A: T/T (deposit + balance before delivery). We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 25 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample for free charge if we have ready parts in stock, but the customers have to pay the courier cost.
Q7. How do you make our business long-term and good relationship?
A: We provide our clients with one-stop service, from specific component to final assembled products, solving various problem for different clients all over the world.