100kW Portable Load Bank
1) User could load any power within rated power, can test stable state three-phase voltage, current, active power, power factor, frequency of generator set.
2) Whether load/unload by local control panel or by PC software control, user can pre-set the power then press the master load button.
3) Control mode: user can choose local control or intelligent control (PC control)
4) Local manual control: there is local control panel in load bank, with multi load steps, min load steps 1kW, controlled by buttons.
5) Intelligent control: user can control load bank by data processing software of PC to make automatic load/unload, display, record and manager the test data, form curve, graph and can be printed.
6) Control mode interlock: there is switch in control panel to choose control mode, other control mode is invalid if user choose one control mode.
7) With data processing software, could form curve of current, active power, power factor, and frequency, can be printed.
8) One-key load/unload: user can load or unload with one key easy to control.
9) 3 line LED multi-function meter display.
|
System Parameter |
Rated Voltage & Frequency |
400VAC; 3 phase 4 wire, 50/60Hz |
Max Load Power |
100kW |
Load Resolution |
1, 2, 2, 5, 10, 20, 20, 40kW Min Step: 1kW |
Power Factor |
1 |
Load Tolerance (overall) |
±3% |
Fan Control Power |
AC220V single phase 50/60Hz |
Wire Connection |
Load bank input——terminal block Control power input——3-pin plug |
Communication Interface |
RS485 |
Insulation |
F |
Way of Working |
Continuous Working |
Cooling |
Forced air, horizontal air intake and cooling |
Transportation |
With handle |
Dimensions |
540*292*582mm (L×W×H) |
Weight |
About 35kgs |
|
Operating Environment Parameter |
Ambient Temperature |
-20℃~+50℃ |
Relative Humidity |
≤95% |
Atmospheric Pressure |
86~106kPa |
Ventilation Distance |
1-2 meters free of obstacles from air inlet, 3 meters free of obstacles from air outlet |
Safe Working Distance |
There should be an isolation fence 1 meter away from the load bank, and there should be no idlers within 3-5 meters when the load bank is working. |
|
Brands of Main Components |
Contactor |
Schneider |
PLC |
Siemens |
Alloy Resistor |
(self-developing) |
Data Processing Software |
(self-developing) |