3 inch 2500# A351 cf8 motorized gate valve honeywell
1. Design and manufaturing per API 600
2. Face to face dimensions per ANSI B16.10
3. Flanged connection per ANSIB16.5
4. Test and inspection per API598, API600
5. Body material: WCB CF8 CF8M CF3 CF3M WC9 C5...
Our Workshop
Our Warehouse
Our Team
Its the normal and necessary processing of the company request accordidng to ISO9001:2008
Passed the ISO9001:2008 quality system authentication,also it can bo done under customer's special request
Passed the API607 latest edition and API 6FA request.
Packing & Protection: KS standard Seaworthy packing to be applied.
Delivery Terms: EX-works 45-60 calendar days after we received your confirmed order, if 3rd party inspection required, delivery should be extended accordingly.
KS Flow launched our quality management and safety system as ISO 9001, ISO14001, OHSAS18001 and awarded API 6D, API 600, API 607, API 6FA, CE/PED approvals for the product.
Project: SECCO
Client: BP & Sinopec
Year: 2014
Location: Shanghai
Product: Gate, Check, Butterfly valves
Material: CS & SS
Size: NPS2 ~ NPS56
Rating: ANSI 150lb ~ 300lb
Qty: 96 pcs
Project: NEW FCC
Client: SK ENERGY
Year: 2013
Location: Ulsan, Korea
Product: Gate, check, globe valves
Materials: WCB,CF8M,CF8,LCB,CF3,F304,A105,F316L
Size: NPS1~NPS20
Rating: ANSI150lb ~600lb
Qty: 818 pcs
Project: ABS Plant
Client: Mistubishi Chemical Engineering Corporation
Year: 2012
Location: Japan
Product: Ball, gate, check, globe valves
Materials: WCB,CF8
Size: NPS1/2~NPS16
Rating: ANSI150lb ~300lb
Qty: 3287 pcs
A: Sure,It does.Also i do suppose the customer should care more about the technical,quality,and service
A: Generally it is 5-10 days if the goods are in stock. or it EX-works 45-60 calendar days after we received your confirmed order, if 3rd party inspection required, delivery should be extended accordingly.
A: No, Cause what we offer is standard,so we do believe it can match the case.Also we gurantee that if the quality is not good,we will compensate for it and we will take charge of the transportation fees
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: