Enquiries
Message
Home > Products > Other
2019 newest scooter parts motorcycle accessories Electri motorbike throttle grip and switch
  • 2019 newest scooter parts motorcycle accessories Electri motorbike throttle grip and switch

2019 newest scooter parts motorcycle accessories Electri motorbike throttle grip and switch

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Place of Origin:
Guangdong, China
Brand Name:
REKO
Warranty:
/
Product name:
Carburetor Spacer
Surface treatment:
Polishing,Anodizing
Material:
Aluminum/ Alloy/ Stainless Steel/ Titanium
Packaging Details:
Pe box/Pvc box/Corrugated box/ Customers custom
Color:
Red, Purple, Blue, etc. customized
Keywords:
thailand motorcycle parts
Port:
Fedex,ups,shenzhen
Long:
Custom
Width:
Custom
Height:
Custom
Certification:
CUSTOM
Supply Ability
Supply Ability:
10000 Piece/Pieces per Week
Packaging & Delivery



Process typeCNC turning, milling, drilling, grinding, wire EDM cutting etc.
Surface treatmentSand blasting, polishing, Anodize, zinc/nickel/chrome/ plating,Power coating, passivation,Heat treatment, etc.
Drawing FormatPRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE
Tolerance0.01-0.05mm can also be customized
DimensionAs customers' request
Material1.Stainless Steel:AISI303, AISI304, AISI316F, 420,440,etc.
2.Aluminum: Al6061, Al6063, Al7075, Al6082,etc.
3.Brass:C36000, C37700, Hpb59-1, H62, C27200(CuZn37),etc.
4.Steel: carbon steel, alloy steel, etc.
5.Copper
6. Plastic : PVC, POM, Nylon etc.
Trial sample timeAlmost 7-days after confirmation
Delivery timeAbout 7-30 days after receive the pre-payments
Packing detail1.Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes 
Process typeCNC turning, milling, drilling, grinding, wire EDM cutting etc.
Surface treatment

Sand blasting, polishing, Anodize, zinc/nickel/chrome/ plating,

Power coating, passivation,Heat treatment, etc.

Drawing FormatPRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE
Tolerance0.01-0.05mm can also be customized
Packing detail1.Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes
DimensionAs customers' request
Material

1.Stainless Steel:AISI303, AISI304, AISI316F, 420,440,etc.

2.Aluminum: Al6061, Al6063, Al7075, Al6082,etc.

3.Brass:C36000, C37700, Hpb59-1, H62, C27200(CuZn37),etc.

4.Steel: carbon steel, alloy steel, etc.

5.Copper

6. Plastic : PVC, POM, Nylon etc.

Trial sample timeAlmost 7-days after confirmation
Delivery timeAbout 7-30 days after receive the pre-payments


FAQ

 

1. Where are your company located?

We are located in ShenShen,China,Founded in year 2005.

 

2. How can I get the quotation? 
We can offer you price after you offer below:

1. Detailed drawings( 2D File: PDF, CAD, JPG etc.  3D File : STP, IGS, STL, SAT,PRT,IPT etc. )

   ( If no drawing,you can send us sample, we make drawing according to your sample and quote for you )

2. Material  ( Aluminum,Stainless steel,Plastic,Titanium....)
3. Surface treatment (Anodizing,painting,brushing,polishing,Logo laser etching,PVD,knurling...)
4. Quantity ( Normally we offer sample is 2-5pcs )

 

3.What is your MOQ?

No MOQ request. 1pc is accepted.

 

4. How do you guarantee the deliver time?

1. We have independent PMC department to arrange the production plan.

2. We have production meeting every Monday morning to report the production process and discuss the

Production problems and solution.
3. We will make production progress report in our system to ensure the related department will follow the next step process.

 

5. Can you give me help if my products are very urgent?

Yes, We can work overtime and add a few machines to produce these products if you need it urgently.

 

6. Delivery time?

Sample order: 3-5 days for simple parts; 7-15 days for complicated parts.

Mass order: 15-45 days ( Depends on Quantity and processing difficulty )

 

7. How can you ensure the quality?

1.Will double confirm with client for drawing before production.

2.Serious control and management for drawing.

3.Cooperated with quality material supplier.

4.Experienced programmers and machinists.

5.Self-checking during production and checking record.

6.QC checked the size and surface, and made dimension inspection report.

7. Packaging department will double check surface.

8. The dimension report will be sent together with the shipment.

4.  How to pay for the order?

There are 4 options to pay the order, Kindly choose the most suitable way for you to arrange it.

1.Telegraphic Transfer (TT)

2.Letter of Credit  (L/C)

3.Alibaba Trade Assurance

4.Paypal

 

5. What is the shipping method?

Mostly will ship by DHL, UPS, FedEx, TNT.

Usually takes around 3-5 working days (door to door service), We also can arrange shipment via seaway.

  

6. I want to keep our design in secret, can we sign NDA?

Sure, we will not display any customers' design or show to other people, we can sign NDA.

 


No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher