1BBL 2BBL 3BBL 5BBL 10BBL 100L 200L 300L 500L 1000L 2000L small mini beer Brewing brewery manufacturing equipment
Simple description
1) Perfect turnkey solution;
2) Easy operation;
3) Competitive price
Detailed specification List
NO |
Equipment |
Specification |
Quantity |
Brewhouse system |
Malt miller |
|
1 |
Mash tun&Brew kettle |
100L-1000L |
1 |
|
Lautering&whirlpool tank |
100L-1000L |
1 |
|
Plate heat exchanger |
1-15m2/h |
1 |
|
Pump |
1-5m3/h |
1 |
|
Fermentation system |
Fermentation tank |
300L -1000L |
optional |
Yeast adding tank |
1-100L |
1 |
|
Wort oxygenator |
3m3/h |
1 |
|
Cooling system |
Refrigerator |
3HP-10HP |
1 |
Glycol water tank |
500L-2000L |
1 |
|
Pump for cool water tank |
1-5m3/h |
1 |
|
CIP Cleaning system |
Alkali tank |
50L-100L |
1 |
Sterilization tank |
50L-100L |
1 |
|
Pump |
1-3m3/h |
1 |
|
Control system |
Digital display controlling system |
1 |
Components Details
Packaging:Wooden case package and steel frame package, besides, any other package ways suitable for overseas transportation.
Shipping:Delivering from Qingdao port within 30-45 days after the deposit.
Delivery time |
30-45 days after the deposit |
Port of loading |
Qingdao |
Trade terms |
EXW, FOB, CIF |
Mode of transportation |
Sea transport, railway transport |
Packaging |
wooden case for LCL, iron frame for FCL |
Pre-service
1.Our market team can serve you in 24 hours, so please feel free to contact at your convinent.
2.Our dedicated engineers can supply 2D, 3D drawing for you if you needed.
3.Our market team with our engineer with more than 10 years experiences together can satisfy you with any technology problem;
4.Customize machine can be offered(voltage,material,dimension,heating source and so on)
After-service:
1.When shippment, we will supply a whole set of parts for backup.
2.If there is any parts damaged, we are surely can send the part to you in 24 hours.
3.Main machine is 3 years warranty, auxiliary machine is 12 months warranty,
Foreign customers installation photos
We are specilized in producing, design, installation, commission of beer brewing equipment. We are supply turnkey brewery from 50L-20000L and supply other related products like keg, keg filler and washer, bottle filler and washer, etc.
Certificates
FAQ
1.How long is your delievery lead time?
After 30-45 working days when we receiving your payment.
2.Could you caculate the shipping for me?
Yes, please kindly let us know which port is nearest your place.
3.Could you caculate the shipping for me? Yes, we can do all includes custom clearance, etc.