COVNA were awarded both nationally and internationally and it's certified TUV SGS RoHS ISO 9001 for the entire process of design and manufacture of valves.
Product Description:
With timer, automatically drain at settled time. Widely used in filter machine, separator, air tank, dripping feet and other air compressor system parts, Drain lasting time and separationtime is adjustable.
Medium | Water |
Temperature | NBR seal: -5℃ to 80℃ EPDM seal: -5℃ to 100℃ VITON seal: -5℃ to 120℃ |
Pressure | 0Mpa~ 1.6Mpa |
Port size | 1/2" |
Port Thread | G thread |
Orifice(mm) | 3.0 mm |
Voltage | DC-12V, 24V, 36V AC-24V, 120V, 240V/60Hz; 110V, 220V/50Hz |
Tolerance | +/-10% |
Coils | S11B, 24VA(AC), 18W(DC), IP65, 100%ED S91B, 22VA(AC), 17W(DC), IP65, 100%ED |
Material | Body- Brass or stainless steel Seal- NBR, EPDM, VITON Amature Tube- Stainless steel 304 Plunger- Stainless steel 430F Stop-SS 403F Springs- SS 304 Shading rings- Red copper |
1. Tow position, tow way, normal close switch, magnetic solenoid water valve
2. Can be installed any angle, but it is a good coice when the horixontal tube keep upward
3. Used to control automatically the liquid and gas in the pipeline
1.Voltage: DC 12V 24V, AC 220V
2.Normally closed and normally open
3.Material: Brass, stainless steel 304/316 and plastic
4.Pilot-operated, diaphragm and piston
5.Coil with LED light
6.Coil with timer
7.Seal: NBR(≤80℃), VITON(≤130℃), PTFE(≤180℃), EPDM(≤100℃), PPL(≤250℃)
COVNA were awarded both nationally and internationally and it's certified TUV SGS RoHS ISO 9001 for the entire process of design and manufacture of valves.
#ALIBABA SELECTION SUPPLIER WITH 17 YEARS MANUFACTURING EXPERIENCE |
COVNA havs invested in quality assurance, state-of-the-art machining and testing facilities in order to assist customers in safely controlling their processes.
All products are designed, engineered and manufactured by experienced engineers to provide safe, reliable and dependable valves, actuators and solutions.
Packing: Electric valves packed with foam in carton.
Delivery Time: 7-10 working days after payment confirmed.