Battery transfer bogie is a automatic transport trolley with rail, which is the traditional and mature material handling equipment. More importantly, battery transfer bogie has been new favorite in industry transport field all over the world with hot market, especially for workshop transportation.
The battery transfer bogie can run on the Vertical rails, “L”rails, “S” rails, arc-shaped rails, etc. DC motor of battery transfer bogie has following advantages, such as, stable start, large starting torque, small impact to gear reducer, low voltage, long lifetime, etc. Only it is charged fully, battery transfer bogie can run freely without limited distance.
The batteries supply the electricity to the DC motor through the electrical control system. By this ways, we can make the battery transfer bogie to start, stop, go forward, go backward, adjust the speed, and so on.
------All customized design for battery transfer bogie | |
|
Model
|
KPX-2T | KPX-5T | KPX-10T | KPX-20T | KPX-30T | KPX-50T | KPX-100T | KPX-150T | |
Rated load (T) | 2 | 5 | 10 | 20 | 30 | 50 | 100 | 150 | |
Table size(mm) | length | 2000 | 3500 | 3600 | 4000 | 4500 | 5500 | 6500 | 10000 |
Width | 1500 | 2000 | 2000 | 2200 | 2200 | 2500 | 2800 | 3000 | |
Height | 450 | 500 | 500 | 550 | 600 | 650 | 900 | 1200 | |
Wheel Base (mm) | 1200 | 2500 | 2600 | 2800 | 3200 | 4200 | 4900 | 7000 | |
Rail Inner Gauge (mm) | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 2000 | 2000 | |
Wheel Diameter(mm) | Φ280 | Φ300 | Φ300 | Φ350 | Φ400 | Φ500 | Φ600 | Φ600 | |
Wheel Quantity(Nos) | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance (mm) | 50 | 50 | 50 | 50 | 50 | 50 | 75 | 75 | |
Motor Power (Kw) | 1 | 1.2 | 1.6 | 2.2 | 3.5 | 5 | 10 | 15 | |
Battery Capacity (Ah) | 180 | 180 | 160 | 180 | 250 | 330 | 440 | 600 | |
Battery Voltage (V) | 24 | 36 | 48 | 48 | 48 | 48 | 72 | 72 | |
Running speed (m/min) | 0-30 | 0-30 | 0-25 | 0-25 | 0-25 | 0-20 | 0-20 | 0-18 | |
Running Time When Full Load(Hours) | 4.32 | 5.4 | 4.8 | 4 | 3.5 | 3.3 | 3.2 | 3.2 | |
Running Distance for One Charge(Km) | 6.5 | 8.1 | 7.2 | 4.8 | 4.2 | 4 | 3.8 | 3.2 | |
Max Wheel Load (KN) | 14.4 | 25.8 | 42.6 | 77.7 | 110.4 | 174 | 343.8 | 265.2 | |
Reference Weight (t) | 2.8 | 3.6 | 4.2 | 5.9 | 6.8 | 8 | 14.5 | 26.8 | |
Recommended Rail Model | P15 | P18 | P18 | P24 | P38 | P43 | QU100 | QU100 |
Battery transfer bogie is applied in many different industries and fields, such as metallurgy plant, warehouse transport, ship industry(maintenance, assemble, container transfer), workpiece transfer, steel plant(steel billet, steel plate, steel coil, steel pipe), construction(building, concrete column), petroleum plant(oil pump, sucker rod and parts), energy industry(windmill), chemical industry(electrolytic cell, retort etc), railway(rail maintenance, rail welding, train tractor), etc.
Xinxiang New Leader Machinery Manufacturing Co., Ltd is devoted to manufacturing material handling and lifting equipment with ISO9001, CE, SGS and SASO certificates. We can produce 1-500 ton seven series transfer carts and covers more than 90 products. Meanwhile, we are also a professional manufacturer of various electric winches and rail wheels, and a experienced supplier of GB standard rail track.
1.Q: Whether battery transfer bogie can be customized?
A: Sure. All battery transfer bogies can be customized as per customers’ requirement.
2.Q: How can I operate battery transfer bogie?
A: Please don’t worry, dear. English user manual, parts manual will be delivered with your items together.
3.Q: How can I install battery transfer bogie?
A: We will free provide installation drawing and technical guidance for battery transfer bogie. Our engineer will go to your factory to guide the installation if necessary.
4.Q: How to guarantee quality of battery transfer bogie?
A: Battery transfer bogie will be tested before delivery, and quality certification will be sent you to check. You can visit our factory and test it by yourself, or let third-parties to do the inspection for you.
5.Q: How about delivery time?
A: Generally speaking, the delivery time is 45 days, and it depends on quantity and products requirement, we will try our best to deliver it as soon as possible.
6.Q: How about payment term?
A: Generally speaking, 50%T/T deposit in advance, the balance 50% is paid by T/T before dispatch. 30% T/T deposit in advance, the balance 70% is paid by T/T before dispatch also can be accepted.
7.Q: If meeting urgent demand, what should I do?