1.Small investment,high output.
2.Easy installation and maintenance.
3.Good effifiency.
4.The roller is wearproof.
Wet pan mill full name is wet grinding machine,according to the different operating methods, devided into roller gold machine,mixed mercury grinding, grinding machine,electric milling.
For a variety of ferrous metals,non-ferrous metals,non-metallic mineral grinding operations,as well as dilute precious metals,gold and silver grinding,selection,processing operations is the majority of small and medium-sized concentrator milling plant the best first grinding equipment.
Product Description
Features of pan mill
The gold milling machine mainly through the mixing, rolling, crushing, and rolling of the raw materials to achieve a balanced moisture content, a uniform ratio, and a low air content to improve the molding rate and molding quality. It has the characteristics of high density, good strength, and no pores. High efficiency and energy saving, high output, this product is used for the recovery of tailings in the iron ore process, so that the ore powder is not lost, so that the effective resources can be fully utilized.
Product Paramenters of wet pan mill
1. The raw material should be put into the machine after the machine running normally.
2. This machine is not allowed to state with the material in the machine. If the machine is stopped because of stoppage, the residual material in the machine should be cleared. Then start the machine again.
3. The material should be put into the machine uniformity, not sometimes much sometimes less. It's better to use a feeding equipment.
4.The bearing part should be add butter regularly.
5. Every bolts should be checked to avoid flexible.
6.The bearing should be changed in time if it is damaged to avoid damage other parts.
7. While the machine is running formally, you should check if there is abnormal sound in the reducer box and or bearing part, if there is a too high temperature, if there is too big motor current and so on. If it happened, you should stop the machine to remedy of the trouble.
8. The motor V-belt should be removed while examine and repair the machine for your safe.
1.Standard parts usually are packed in the wooden cases or frame.
2.Big parts ususally are packed with plastic membrane or clolor plastic membrane.
3-10 days after confirming order,detail delivery date should be decided according to
production season and order quantity.
Service---customer comes first!
1.Pre-sale services:Act as a good adviser and assistant of clients, enable them to get rich and generous returns on their investments.
1>. Select equipment model;
2>. Design and manufacture products according to clients' special requirement;
3>. Train technical personnel for clients.
2.Services during the sale:Respect clients, devote ourselves to improving the total value of clients.
1>. Pre-check and accept products ahead of delivery;
2>. Help clients to draft solving plans.
3.After-sale services:Provide considerate services to minimize clients' worries.
1>. Assist clients to prepare for the first construction scheme;
2>. Install and debug the equipment;
3>. Train the first-line operators;
4>. Examine the equipment;
5>. Take initiative to eliminate the troubles rapidly;
6>. Provide perfect service;
7>. Provide technical exchanges.